NYC DOB record · M01328449-I1

301 West 57 Street

301 West 57 Street, Manhattan, NY 10019

Alteration filing in Hell's Kitchen, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 2, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01328449-I1

301 West 57 Street

Manhattan, NY 10019

Alteration filing · status dated Aug 31, 2026

Current record
Recorded as completed
Proposed scale
55 stories
Dwelling units
296
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01328449-I1 as a alteration filing at 301 West 57 Street, Manhattan, NY 10019. Its latest published status category is Recorded as completed, dated Aug 31, 2026. The filing records 55 proposed stories and 296 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Aug 31, 2026
Proposed scale
55 proposed stories and 296 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1076205Applicant of recordSee the 5 filings that name Vail Associates Architects
FiledJan 14, 2026
Current recordRecorded as completed
Proposed scale55 stories
Recorded cost$162,295

What the filing says

A public-record reading of the proposed work.

Alt 2. upgrade kitchen and bathroom with new appliances and plumbing fixtures. new wood flooring. no change in use, occupancy or egress.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 56-story condominium built in 1987, with 295 homes, on a 10,042 sq ft lot.

Built
1987
Floors
56
Residential units
295
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
C6-6
Lot area
10,042 sq ft
Building area
257,885 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 17, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 11 open notices on record for this building, out of 55 notices on file; the most recent was issued Mar 24, 2021.

  • Elevator

    Issued Mar 24, 2021

  • Elevator

    Issued Mar 24, 2021

  • Construction

    Issued Nov 3, 2017 — BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED FOR APPLICATION #123 302611. THE PERMIT HOLDER OF RECORD HAS WITHDRAWN FROM THE PROJECT. ST OP ALL WORK, MAKE SITE SAFE, PROVIDE ALL REQUIRED INFORMATION FORTHWIT H

  • 8 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 17, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01328449-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01328449-I1
BBL
1010487503
Review type
Standard Plan Examination
Existing stories
55
Proposed stories
55
Existing dwelling units
296
Proposed dwelling units
296
General construction