What the filing says
A public-record reading of the proposed work.
Propose plumbing work of apartment #14C @ partial 14th floor of existing residential building as per plan. No change in use, egress, or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 56-story condominium built in 1987, with 295 homes, on a 10,042 sq ft lot.
- Built
- 1987
- Floors
- 56
- Residential units
- 295
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- C6-6
- Lot area
- 10,042 sq ft
- Building area
- 257,885 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 17, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 11 open notices on record for this building, out of 55 notices on file; the most recent was issued Mar 24, 2021.
- Elevator
Issued Mar 24, 2021
- Elevator
Issued Mar 24, 2021
- Construction
Issued Nov 3, 2017 — BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED FOR APPLICATION #123 302611. THE PERMIT HOLDER OF RECORD HAS WITHDRAWN FROM THE PROJECT. ST OP ALL WORK, MAKE SITE SAFE, PROVIDE ALL REQUIRED INFORMATION FORTHWIT H
8 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 17, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01344272-P3.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01344272-P3
- BBL
- 1010487503
- Postal code
- 10019 · 552 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 296
- Proposed dwelling units
- 296