What the filing says
A public-record reading of the proposed work.
Window lintel replacement and parapet wall replacement as per plan. no change in use, egress or occupancy with this application
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story walk-up apartment building built in 1920, with 7 homes, on a 2,839 sq ft lot.
- Built
- 1920
- Floors
- 3
- Residential units
- 7
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R7A
- Lot area
- 2,839 sq ft
- Building area
- 5,625 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 15 open notices on record for this building, out of 23 notices on file; the most recent was issued Jan 9, 2026.
- Construction
Issued Jan 9, 2026 — FTC W/COMMISSIONER'S ORDER CONTROL#348021 VIO#121625PI20703TC DATED 12/16/25 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 01/06/2026. AS OF 01/08/2026 THE REQ'D CAP WAS NOT REC'D. IMMED COMPLY W/COMMISSIONER'S ORDER #348021 VIO#121625PI20703TC
- Construction
Issued Dec 16, 2025 — FTM BLDG IN A CODE COMPLIANT MANNER-OBSVD CRACK IN PARAPET @ EXP1 & CRACKS IN PARAPET @ EXP3. AN ANNUAL PARAPET OBSERVATION REPORT IS REQ'D T/BE COMPLETED ANNUALLY STARTING IN 2024. SUBMIT ANNUAL PARAPET OBSERVATION REPORT TO BE REC'D BY DOB NO LATER THAN 12/30/25
- Construction
Issued Dec 16, 2025 — CORRECTIVE ACTION PLAN REQ'D-OBSVD CRACK AT EXP4 PARAPET LEVEL AND CRACKS AT EXP3 PARAPET LEVEL. OWNER TO IMMED RETAIN REG DESIGN PROF TO EVAL ENTIRED BLDG AND SUBMIT A CORRECTIVE ACTION PLAN BY 1/6/2026 ADDRESSING ALL CONDITIONS W/PLANS,PHOTOS RECOMMENDING A TIME FRAME & REPAIRS T/BE COMPLETED.BLDG T/BE REPAIRED UNDER PERMIT START 2/15/26
12 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01387319-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01387319-I1
- BBL
- 2033430006
- Postal code
- 10467 · 113 filings
- Review type
- Professional Certification
- Existing stories
- 3
- Proposed stories
- 3
- Existing dwelling units
- 7
- Proposed dwelling units
- 7








