What the filing says
A public-record reading of the proposed work.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 57-story condominium built in 1989, with 830 homes, on a 81,173 sq ft lot.
- Built
- 1989
- Floors
- 57
- Residential units
- 830
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- C1-9
- Lot area
- 81,173 sq ft
- Building area
- 923,029 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 19, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 14 open notices on record for this building, out of 165 notices on file; the most recent was issued Aug 4, 2026.
- Construction
Issued Aug 4, 2026 — EMERGENCY WORK ORDER:AS PERVIOUS UNSAFE COMPLIANCE REPORT# CR-M0000281 -1A-I1 FILED 12/30/23. THE PARKING GARGAGE HAS BEEN CLASSIFIELDS UNSAF E IN THE CYCLE 1. WHILE TEMP SHORING CURRENTLY INSTALLED UNDER DOB JOB PERMIT #M00971688-I1-S1. THE QPSI RECOMEDATING THAT THIS IS STRICTLY A TEMP MEASURE. IT DOES NOT SERVE AS A LONG TERM SOLUTION AND STRUCTUR
- No report and / or late filing (facade)
Issued Feb 22, 2024 — FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
- Facade safety program
Issued Jul 1, 2019
11 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 19, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01391969-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01391969-I1
- BBL
- 1009437501
- Postal code
- 10016 · 422 filings
- Review type
- Professional Certification
- Existing stories
- 57
- Proposed stories
- 57
- Existing dwelling units
- 831
- Proposed dwelling units
- 831