What the filing says
A public-record reading of the proposed work.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story store building built in 1979, on a 19,247 sq ft lot.
- Built
- 1979
- Last altered
- 2000
- Floors
- 5
- Residential units
- 0
- Building type
- Store building
- Land use
- Commercial and office
- Zoning district
- C8-4
- Lot area
- 19,247 sq ft
- Building area
- 95,500 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 23, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 9 open notices on record for this building, out of 130 notices on file; the most recent was issued Apr 28, 2026.
- Construction
Issued Apr 28, 2026 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. NOTED, AT THE TIME OF INSPECTION I OBSERVED LONG VERTICAL CRACKS AT MULTIPLE LOCATIONS ON ALL EXPOSURES. DETERIORATED MORTAR JOINTS OBSERVED ON EXPOSURE 2 AND EXPOSURE 4. REMEDY: REPAIR AND/OR REPLACE
- Construction
Issued Oct 3, 2024 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED CRACKS ON MASONRY AT SEVERAL LOCATIONS ON EXP#1;2;3&4 (N,E,S & W ELEV).ALSO OBSERVED LOOSE/MISSING MORTAR JOINT AT PARAPET LEVEL OF EXP#4 W.ELEV, & STEP CRACKS AT ROOF BULKHEAD DIRECTLY FACING EXP#3 (S.ELEV). REMEDY: FIX AND/OR REPLACE
- Construction
Issued May 7, 2024 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED CRACKED CMU BLOCK/STONES AT EXP #1. OBSERVED MISSING DAMAGE MOTAR JOINTS AT THE PARAPET LEVEL OF EXP #1,2,3,4. OBSERVED CRACKS IN MULTIPLE LOCATIONS & SPALLING CMU BLOCK/STONE AT EXP #1,3,4 REMEDY: REPAIR/REPLACE
6 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 23, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01102733-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 85,681 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01102733-I1
- BIN
- 1044200
- BBL
- 1014350016
- Postal code
- 10065 · 678 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0