NYC DOB record · M01443098-S1

340 East 64 Street

340 East 64 Street, Manhattan, NY 10065

Alteration filing in Upper East Side-Lenox Hill-Roosevelt Island, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 16, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01443098-S1

340 East 64 Street

Manhattan, NY 10065

Alteration filing · status dated Sep 11, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
300
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01443098-S1 as a alteration filing at 340 East 64 Street, Manhattan, NY 10065. Its latest published status category is Approved, dated Sep 11, 2026. The filing records 300 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 11, 2026
Proposed scale
300 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1044390Applicant of recordSee the 3 filings that name Ryall Sheridan Architects
FiledAug 28, 2026
Current recordApproved
Proposed scale300 units
Recorded cost$19,000

What the filing says

A public-record reading of the proposed work.

Interior Renovation, new plumbing fixtures to replace existing, branch line replacement back to building risers

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 34-story condominium built in 1965, with 300 homes, on a 35,147 sq ft lot.

Built
1965
Last altered
2014
Floors
34
Residential units
300
Building type
Condominium
Land use
Elevator apartments
Zoning district
C2-8
Lot area
35,147 sq ft
Building area
403,993 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 26, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 5 open notices on record for this building, out of 103 notices on file; the most recent was issued Dec 31, 2025.

  • Construction

    Issued Dec 31, 2025 — EWO. PARKING GARAGE CONSISTING OF 1 LVL BELOW 34 STORY BLDG CRACKED, SPALLED CONCRETE, EXPOSED RE-BARS, CRACKED CONCRETE WALL,RUSTED CORROSION, DEFLECTED STEEL & SHEET METAL OF CEILING @ VAR LOCS NO SHOREING IN PLACE,NO SAFE MEAS. REMEDY: RETAIN NYS (RDP) SUPERVISE INSTALLATION OF SAFE MEAS REPORT TO:PARKINGSTRUCTURES@BUILDINGS.NYC.GO

  • Failure to submit

    Issued Jun 23, 2024 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023)

  • Failure to submit

    Issued Apr 22, 2023 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2022)

  • 2 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 25, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01443098-S1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 70,325 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01443098-S1
BBL
1014387501
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
300
Proposed dwelling units
300