NYC DOB record · M01376584-I1

343 West 47 Street

343 West 47 Street, Manhattan, NY 10036

Alteration filing in Hell's Kitchen, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 26, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01376584-I1

343 West 47 Street

Manhattan, NY 10036

Alteration filing · status dated Sep 24, 2026

Current record
Approved
Proposed scale
70 stories
Dwelling units
4
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01376584-I1 as a alteration filing at 343 West 47 Street, Manhattan, NY 10036. Its latest published status category is Approved, dated Sep 24, 2026. The filing records 70 proposed stories and 4 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 24, 2026
Proposed scale
70 proposed stories and 4 proposed dwelling units
Applicant of recordSee the 691 filings that name Fl&m Engineering Design &inspection
FiledApr 2, 2026
Current recordApproved
Proposed scale70 stories
Recorded cost$25,000

What the filing says

A public-record reading of the proposed work.

Installation of 300 psf sidewalk shed, pipe scaffold with an engineered enclosure on exposure 02 and chain link fence as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story walk-up apartment building built in 1920, with 4 homes, on a 2,510 sq ft lot.

Built
1920
Last altered
2023
Floors
4
Residential units
4
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R8
Lot area
2,510 sq ft
Building area
5,272 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 26, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 10 open notices on record for this building, out of 24 notices on file; the most recent was issued Jan 12, 2026.

  • Construction

    Issued Jan 12, 2026 — EMER WORK - 7 STY BLDG UNDER CONSTRUCTION. 35 FT SIDEWALK SHED & SCAFF PART COLLAPSED @ EXP 2 INTO ADJ PLAYGROUND; SCAFF ABOVE UNSUPPORTED POTENTIAL HAZARD TO SITE, PUBLIC & ADJ PROPERTY. REMEDY: COMPLY W/CODE RETAIN NYS PE, CS & GC 2 TEMP STAB COLLAPSED AREA SUBMIT SIGNED,SEALED DOCS TO YONUH@BUILDINGS.NYC.GOV

  • Immediate

    Issued Nov 25, 2022 — SEAL ALL OPENINGS AT FRONT AND REAR OF BUILDINGS ON ALL LEVELS TO SAFEGUARD THE PUBLIC AND PROPERTY

  • Fail to certify class

    Issued Aug 4, 2021 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

  • 7 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 26, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01376584-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01376584-I1
BIN
1025089
BBL
1010380011
Review type
Professional Certification
Existing stories
70
Proposed stories
70
Existing dwelling units
4
Proposed dwelling units
4
Sidewalk shedScaffolding