What the filing says
A public-record reading of the proposed work.
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 20-story elevator apartment building built in 1962, with 383 homes, on a 67,805 sq ft lot.
- Built
- 1962
- Floors
- 20
- Residential units
- 383
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R7-1
- Lot area
- 67,805 sq ft
- Building area
- 404,149 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 10, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 8 open notices on record for this building, out of 96 notices on file; the most recent was issued Dec 31, 2025.
- Construction
Issued Dec 31, 2025 — BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER PERMIT #B01129714-I1 ON 10/22/25. INTENT TO REVOKE APPROVAL AND PERMIT. STOP ALL WORK IMMEDIATELY EXCEPT TO MAKE SITE SAFE.
- Construction
Issued Dec 9, 2025 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED AT EXPOSURE 1 DEFECTED BALCONY SLABS. EXPOSURE 2 DAMAGED JOINTS. EXPOSURE 3 MISSING BRICKS, CRACK AND DEFECTED BALCONY. EXPOSURE 4 DAMAGED JOINTS. REMEDY: REPAIR AND/OR REPLACE
- Plumbing
Issued Jun 20, 2025 — BASE ON COMMISSIONER'S SUSPENSION NOTIFICATION INTENDS TO REVOKE ALL PLUMBING APPROVALS AND PERMIT ISSUED UNDER JOB #300321505 DUE TO SUSPENSION OF LICENSE MASTER PLUMBER #001343, STOP ALL PLUMBING WORK UNDER ABOVE MENTIONED PERMIT IMMEDIATELY.
5 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 9, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01291850-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 79,354 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01291850-I1
- BBL
- 3087210360
- Postal code
- 11235 · 1879 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source