NYC DOB record · B00763911-I1

350 65 Street

350 65 Street, Brooklyn, NY 11220

Alteration filing in Bay Ridge, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 22, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00763911-I1

350 65 Street

Brooklyn, NY 11220

Alteration filing · status dated Nov 20, 2026

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
391
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00763911-I1 as a alteration filing at 350 65 Street, Brooklyn, NY 11220. Its latest published status category is Recorded as completed, dated Nov 20, 2026. The filing records 391 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Nov 20, 2026
Proposed scale
391 proposed dwelling units
The building, not the filingopen housing violations, the owner of record and every filing at BIN 3144194Applicant of recordSee the 242 filings that name Mohammad Ahead, PE
FiledJun 24, 2022
Current recordRecorded as completed
Proposed scale391 units
Recorded cost$5,000

What the filing says

A public-record reading of the proposed work.

Installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 28-story elevator apartment building built in 1971, with 391 homes, on a 199,435 sq ft lot.

Built
1971
Floors
28
Residential units
391
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R7-1
Lot area
199,435 sq ft
Building area
360,080 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 22, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 13 open notices on record for this building, out of 74 notices on file; the most recent was issued Sep 17, 2026.

  • Construction

    Issued Sep 17, 2026 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AS NOTED:EXP1 NORTH ELEV:DAMAGED ERODING MORTAR JOINT AT LINTEL ON MULTIPLE FLOORS.E XP2&3 EAST & SOUTH ELEV:ERODED MORTAR JOINTS,CRACKS IN BRICK WORK.SPAL LING CRACKS ON BALCONY SLABD ON SEVERAL FLOORS.ROOF:ERODING,MISSING MO RTAR JOINTS IN BULKHEAD BRICK WORK.REMEDY:REPAIR AND/OR REPLACE MASONR

  • Construction

    Issued Dec 16, 2025 — FAILURE TO MAINTAIN BLDG IN SAFE CONDITION.PRKNG STRUCT W/PRECAST DOUBLE TEE PLANLS@DECK SUPPORTD BY PRECAST BEAMS,COLUMS,X-BRACES DOWN TO LIRR UNDERPASS BELOW.PRECASR CONC BEAMS,COLUMNS,BRACES.IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER 342075 (051425FEU31003PN)DATED 5/14/2025

  • Construction

    Issued Nov 20, 2025 — AS PER SECTION 28-207.2 STOP ALL WORK UNDER PERMIT # B01191442-I1 DUE TO APPLICANT OF RECORD HAS NOTIFIED THE DEPARTMENT THAT HE OR SHE HAS WITHDRAWN FROM THE PROJECT 28-104.8.3. STOP ALL WORK IMMEDIATELY AND MAKE SITE SAFE.

  • 10 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 22, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00763911-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “LOC Issued.”

    03
  4. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    04

For scale: half of DOB filings are permitted within 23 days of being filed and a quarter take longer than 4 months, measured across 99,692 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00763911-I1
BBL
3058260001
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
391
Proposed dwelling units
391
Sidewalk shed