What the filing says
A public-record reading of the proposed work.
Filing for sunroom extension at roof level of the existing 5th floor. filing to remove window for apartment 5e for sunroom access. patch and repair surfaces as required. filing to address violation no. 39129924k no change to use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 7-story condominium built in 2018, with 101 homes, on a 30,000 sq ft lot.
- Built
- 2018
- Last altered
- 2018
- Floors
- 7
- Residential units
- 101
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- R7D
- Lot area
- 30,000 sq ft
- Building area
- 161,202 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 22, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 18 notices on file; the most recent was issued Aug 12, 2026.
- Construction
Issued Aug 12, 2026 — OBSERVED BALCONIES PROTRUDING RIGHT OF WAY AT PUBLIC SIDEWALK MYRTLE AVE,THROOP AVE AND VERNON AVE NOT COMPLY WITH BC3202.2.1.3, JOB 320984208,SIGNED OFF 12/02/2022 PLANS SHOW BALCONIES LENGTH OF 2 FOOT 6 INCHES FROM EXTERIOR OF BUILDING, NO ALT PERMITS NO CERTIFIED TR1 FOR WORK PERFORMED HAZARD UNKNOWN STRUCTURAL STABILITY
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 22, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01143850-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 23 days of being filed and a quarter take longer than 4 months, measured across 99,692 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01143850-I1
- BBL
- 3017567501
- Postal code
- 11206 · 3374 filings
- Review type
- Standard Plan Examination
- Existing stories
- 6
- Proposed stories
- 6
- Existing dwelling units
- 68
- Proposed dwelling units
- 68