What the filing says
A public-record reading of the proposed work.
Alteration type 3 - construction equipment - sidewalk-shed proposed installation of heavy duty sidewalk shed filed for remedial repairs as per plans. no change in use occupancy or egress under this application. live load 300 per square feet.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story elevator apartment building built in 1906, with 87 homes, on a 20,000 sq ft lot.
- Built
- 1906
- Last altered
- 1974
- Floors
- 5
- Residential units
- 87
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R6
- Lot area
- 20,000 sq ft
- Building area
- 69,450 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 1, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 8 open notices on record for this building, out of 20 notices on file; the most recent was issued Jun 9, 2026.
- Construction
Issued Jun 9, 2026 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED CRACKED SPALLED/SPALLING STUCCO AT PARAPET LEVEL ON EXPOSURE 1. ALSO UNFINISHED PARAPET WALL
- Construction
Issued May 29, 2026 — FTC W/COMMISSIONER'S ORDER CONTROL#348502 & VIO#040926PI20101SB DATED 04/09/26 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 05/09/26. AS OF 05/29/26 THE REQ'D CAP WAS NOT REC'D. IMMED COMPLY W/ COMMISSIONER'S ORDER CONTROL#348502 & VIO#040926PI20101SB
- Construction
Issued Apr 9, 2026 — CORRECTIVE ACTION PLAN REQ'D-OBSVD @ EXP1 MISSING/CRACKED STUCCO ON PARAPET WALL INSIDE & OUTSIDE,MAIOR CRACK ON EXP2 THAT SUPPORTS MECH SYSTEM DIRECTLY ABOVE ON ROOF. OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANDING W/DOB AND NYS TO EVAL THE ENTIRE BLDG AND TO SUBMIT A CORRECTIVE ACTION PLAN BY 05/09/2026
5 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X00316687-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X00316687-I1
- BIN
- 2091297
- BBL
- 2025710014
- Postal code
- 10454 · 153 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 87
- Proposed dwelling units
- 87