NYC DOB record · B00375954-I1

373 92 Street

373 92 Street, Brooklyn, NY 11209

Alteration filing in Bay Ridge, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 12, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00375954-I1

373 92 Street

Brooklyn, NY 11209

Alteration filing · status dated May 16, 2022

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
99
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00375954-I1 as a alteration filing at 373 92 Street, Brooklyn, NY 11209. Its latest published status category is Recorded as completed, dated May 16, 2022. The filing records 99 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
May 16, 2022
Proposed scale
99 proposed dwelling units
Applicant of recordSee the 974 filings that name Syed Engineering, P.C.
FiledJul 25, 2020
Current recordRecorded as completed
Proposed scale99 units
Recorded cost$15,000

What the filing says

A public-record reading of the proposed work.

Alteration type 3 - construction equipment - sidewalk-shed installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the NYC building code.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story elevator apartment building built in 1929, with 93 homes, on a 24,300 sq ft lot.

Built
1929
Floors
6
Residential units
93
Building type
Elevator apartment building
Land use
Mixed residential and commercial
Zoning district
R6A
Lot area
24,300 sq ft
Building area
100,841 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 54 notices on file; the most recent was issued Nov 2, 2017.

  • Failure to

    Issued Nov 2, 2017 — FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

  • Failure to

    Issued Aug 2, 2017 — FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

  • Failure to

    Issued May 2, 2017 — FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

  • 1 further open notice is on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00375954-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00375954-I1
BIN
3154744
BBL
3060860045
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
99
Proposed dwelling units
99