NYC DOB record · X01182969-I1

3848 Bailey Avenue

3848 Bailey Avenue, Bronx, NY 10463

Alteration filing in Kingsbridge Heights-Van Cortlandt Village, Bronx. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 19, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01182969-I1

3848 Bailey Avenue

Bronx, NY 10463

Alteration filing · status dated Sep 17, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
2
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01182969-I1 as a alteration filing at 3848 Bailey Avenue, Bronx, NY 10463. Its latest published status category is Approved, dated Sep 17, 2026. The filing records 2 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 17, 2026
Proposed scale
2 proposed dwelling units
Applicant of recordSee the 3 filings that name Kc Expediting Inc
FiledMar 26, 2025
Current recordApproved
Proposed scale2 units
Recorded cost$1,000

What the filing says

A public-record reading of the proposed work.

Filing for construction fence as per plans

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a vacant land on a 6,268 sq ft lot.

Residential units
0
Building type
Vacant land
Land use
Vacant land
Zoning district
R7-1
Lot area
6,268 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 22, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 4 notices on file; the most recent was issued Apr 13, 2026.

  • Construction

    Issued Apr 13, 2026 — UNSPPRTED EXCAV FROM DEMO OF RW COMPRMISED REAR YARDS @ EXP 3&4 ADJ PROPERTIES VACATED REMEDY:PE TO INSPECT BERM & EXPOSED ELEMENTS MIN. TWICE WEEKLY AND SUBMIT SIGNED/SEALED REPORTS TO CSE

  • Construction

    Issued Apr 13, 2026 — UNSUPPORTED EXCAVATION FROM DEMO OF RETAINING WALL COMPROMISED REAR YARDS @ EXP 3&4. ADJ PROPERTIES VACATED. IMMEDIATE HAZRD TO PUBLIC & ADJ SITES. REMEDY: RETAIN PE TO EVAL & FILE REPAIR PLANS FOR RETAINING WALL BY 4/24/26. PERMIT BY 5/15/26, START 5/20/26. EMAIL CSE BY EMAIL JROLON@BUILDINGS.NYC.GOV AND ANDOULAH@BUILDINGS.NYC.GOV

  • Construction

    Issued Apr 13, 2026 — UNSPPRTED EXCAV FROM DEMO OF RW COMPRMISED REAR YARDS @ EXP 3&4. ADJ PROPERTIES VACATED REMEDY: SUBMIT DRAWINGS, PERMITS, INSPECTION/TECHNICAL REPORTS, SURVEY SOE & FOUNDATION PLANS TO DOB BY 4/24/26

  • 1 further open notice is on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 22, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01182969-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01182969-I1
BIN
2131195
BBL
2032630037
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
2
Proposed dwelling units
2