NYC DOB record · M01258214-I1

400 Second Avenue

400 Second Avenue, Manhattan, NY 10010

Alteration filing in Gramercy, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 10, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01258214-I1

400 Second Avenue

Manhattan, NY 10010

Alteration filing · status dated Oct 7, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
522
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01258214-I1 as a alteration filing at 400 Second Avenue, Manhattan, NY 10010. Its latest published status category is Approved, dated Oct 7, 2026. The filing records 522 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 7, 2026
Proposed scale
522 proposed dwelling units
The building, not the filingopen housing violations, the owner of record and every filing at BIN 1084709Applicant of recordSee the 1490 filings that name Ashraf Corp
FiledJul 18, 2025
Current recordApproved
Proposed scale522 units
Recorded cost$1,000

What the filing says

A public-record reading of the proposed work.

Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. live load 300psf.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 27-story elevator apartment building built in 1970, with 510 homes, on a 104,861 sq ft lot.

Built
1970
Floors
27
Residential units
510
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
C1-9A
Lot area
104,861 sq ft
Building area
927,591 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 10, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 19 open notices on record for this building, out of 86 notices on file; the most recent was issued Feb 21, 2022.

  • Failure to correct swarmp conditions (facade)

    Issued Feb 21, 2022 — CYCLE 9A FAILURE TO CORRECT SWARMP CONDITIONS

  • Hazardous condition (facade)

    Issued Feb 21, 2022 — CYCLE 9A UNSAFE REPORT FILED

  • Construction

    Issued Nov 12, 2021 — UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. AT TIME OF INSPECTION, OBSERVED WOODEN LINT/VENTILATION BOX ERECTED OUTSIDE OF THE 2ND FLOOR LAUNDRY ROOM. WOOD SHED NOT IN COMPLIANCE WITH THE COMMISSIONERS ORDERS FOR REMEDIES OF VIOLATIONS #35250102K, #35373186R.

  • 16 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 9, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01258214-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 79,348 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01258214-I1
BBL
1009290001
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
522
Proposed dwelling units
522
Sidewalk shed