What the filing says
A public-record reading of the proposed work.
Installation of pipe scaffolding as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use, occupancy, or egress under this application. the pipe scaffold at the front of the building and top of the sidewalk shed to th
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story condominium built in 1874, with 4 homes, on a 6,188 sq ft lot.
- Built
- 1874
- Last altered
- 2004
- Floors
- 6
- Residential units
- 4
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- M1-5/R7X
- Lot area
- 6,188 sq ft
- Building area
- 36,331 sq ft
- Historic district
- SoHo-Cast Iron Historic District Extension
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 29, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 38 notices on file; the most recent was issued May 10, 2012.
- Construction
Issued May 10, 2012
- Construction
Issued Jun 15, 1990
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 29, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01303864-S1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 88,832 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01303864-S1
- BBL
- 1004737505
- Postal code
- 10013 · 947 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 4
- Proposed dwelling units
- 4








