NYC DOB record · M01393105-I1

421 East 55 Street

421 East 55 Street, Manhattan, NY 10022

Alteration filing in East Midtown-Turtle Bay, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 26, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01393105-I1

421 East 55 Street

Manhattan, NY 10022

Alteration filing · status dated Sep 23, 2026

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01393105-I1 as a alteration filing at 421 East 55 Street, Manhattan, NY 10022. Its latest published status category is Recorded as completed, dated Sep 23, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Sep 23, 2026
Proposed scale
Not stated in this filing
The building, not the filingopen housing violations, what it sold for, the owner of record and every filing at BIN 1040461Applicant of recordSee the 12 filings that name ANB Engineering PC
FiledMay 15, 2026
Current recordRecorded as completed
Proposed scaleNot specified
Recorded cost$3,000

What the filing says

A public-record reading of the proposed work.

Scope is to indicate all existing cooking equipment and mechanical infrastructure for record and reference only. Mechanical plans are reference only in reference to plumbing filing M01393105-S1.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story garage or fuel station built in 1949, on a 24,960 sq ft lot.

Built
1949
Floors
2
Residential units
0
Building type
Garage or fuel station
Land use
Parking facilities
Zoning district
R10
Lot area
24,960 sq ft
Building area
65,700 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 26, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 5 open notices on record for this building, out of 7 notices on file; the most recent was issued Feb 17, 2019.

  • Failure to

    Issued Feb 17, 2019 — FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

  • Failure to

    Issued Jun 6, 2014 — FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

  • Failure to

    Issued Jun 3, 2013 — FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

  • 2 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 25, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01393105-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01393105-I1
BBL
1013670010
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
0