NYC DOB record · B01111764-I1

4211 14 Avenue

4211 14 Avenue, Brooklyn, NY 11219

Alteration filing in Borough Park, Brooklyn. The latest DOB status is permit issued.

A permit has been issued for this filing. It may cover part of the work rather than all of it. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 13, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01111764-I1

4211 14 Avenue

Brooklyn, NY 11219

Alteration filing · status dated Sep 11, 2026

Current record
Approved
Proposed scale
4 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01111764-I1 as a alteration filing at 4211 14 Avenue, Brooklyn, NY 11219. Its latest published status category is Approved, dated Sep 11, 2026. The filing records 4 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 11, 2026
Proposed scale
4 proposed stories
Complete building dossierView all 2 filings associated with BIN 3135976Applicant of recordSee the 25 filings that name NYC School Construction Authority
FiledFeb 5, 2025
Current recordApproved
Proposed scale4 stories
Recorded cost$20M

What the filing says

A public-record reading of the proposed work.

Removal and replacement of face brick masonry, as indicated on drawings.2. removal and replacement of selective decorative terra cotta and limestonemasonry, as indicated on drawings.3. partial roofing removal and replacement at roof no. 1 (main roof).

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 5-story educational building built in 1963, on a 40,066 sq ft lot.

Built
1963
Floors
5
Residential units
0
Building type
Educational building
Land use
Public facilities and institutions
Zoning district
R6
Lot area
40,066 sq ft
Building area
87,000 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 13, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 22 open notices on record for this building, out of 72 notices on file; the most recent was issued Jun 30, 2023.

  • Low pressure boiler

    Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Jun 20, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION

  • 19 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 13, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01111764-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Issued.”

    04

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01111764-I1
BBL
3056000001
Review type
Standard Plan Examination
Existing stories
4
Proposed stories
4
Existing dwelling units
0
Proposed dwelling units
0
General constructionStructural work