What the filing says
A public-record reading of the proposed work.
Nycha boiler-structrual work in the cellar floor as per plans filed herewith. no change in use, egress or occupancy
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 14-story elevator apartment building built in 1948, with 591 homes, on a 323,438 sq ft lot.
- Built
- 1948
- Floors
- 14
- Residential units
- 591
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R6
- Lot area
- 323,438 sq ft
- Building area
- 458,572 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 23 notices on file; the most recent was issued Jun 2, 2025.
- Construction
Issued Jun 2, 2025 — FAILURE TO MAINTAIN BUILDING EXTERIOR FACADE IN A CODE COMPLIANT MANNER. AT TIME OF INSPECTION IT WAS OBSERVED BALCONIES AT EXOSURES 1 & 3 (WEST & EAST ELEVATION) CRACKED, SPALLING AND EXPOSED REBARS AT MULTIPLE LOCATION. REMEDY: REPAIR AND/OR REPLACE
- Construction
Issued May 14, 2025 — PARTIAL VACATE ORDER:OBSERVED CRACKED/SPALLED UNDERSIDE CONCRETE SLAB BALCONY AT EXPO 1 & 3, WEST & EAST ELEVATION OF ALL BALCONY LINES REMEDY: VACATE ALL BALCONY AT ALL 4 EXPOSURES, WEST, NORTH, EAST & SOUTH ELEVATIONS
- Failure to correct swarmp conditions (facade)
Issued Feb 24, 2021 — NYCHA CYCLE 8A FAILURE TO CORRECT SWARMP CONDITIONS
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00461906-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 61,761 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00461906-I1
- BBL
- 3037940001
- Postal code
- 11212 · 2044 filings
- Review type
- Standard Plan Examination
- Existing stories
- 14
- Proposed stories
- 14
- Existing dwelling units
- 112
- Proposed dwelling units
- 112