Building record · BIN 3328126

430 Dumont Avenue

430 Dumont Avenue, Brooklyn, NY 11212

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 16 independently sourced records, including 6 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 3328126

430 Dumont Avenue

Brownsville, Brooklyn

A consolidated public-record view · updated Aug 25, 2026

DOB filings
16
Active-status
6
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings16
Open or active-status records6
First included filingApr 4, 2019
Latest recorded changeAug 25, 2026

The lot

What is already here?

The lot holds a 14-story elevator apartment building built in 1948, with 591 homes, on a 323,438 sq ft lot.

  1. Floors 2–14Homes591 homes are recorded on this lot — about 45 homes to a floor. The city does not publish which floor any of them is on.
  2. Floor 1Street levelStreet level. The lot is recorded as elevator apartments.
  • Street levelElevator apartments
  • Homes591 recorded on the lot
  • Above the southern skylineFrom about floor 15 — the tallest thing within 60 m to the south is 42.4 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 43.3 m over 14 floors, as the city counts them. 2 runs of floors have something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1948
Floors
14
Residential units
591
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R6
Lot area
323,438 sq ft
Building area
458,572 sq ft

Housing violations

9 violations are open against this address under the Housing Maintenance Code.

  • 0Immediately hazardous
  • 7Hazardous
  • 2Non-hazardous
  • 0Information order

Open means the Department of Housing Preservation and Development has not recorded it as corrected, which is not the same as nobody having fixed it. The city publishes the apartment each was written against; that is not carried here, because a count says a building has a problem and an apartment number says whose.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 23 notices on file; the most recent was issued Jun 2, 2025.

  • Construction

    Issued Jun 2, 2025 — FAILURE TO MAINTAIN BUILDING EXTERIOR FACADE IN A CODE COMPLIANT MANNER. AT TIME OF INSPECTION IT WAS OBSERVED BALCONIES AT EXOSURES 1 & 3 (WEST & EAST ELEVATION) CRACKED, SPALLING AND EXPOSED REBARS AT MULTIPLE LOCATION. REMEDY: REPAIR AND/OR REPLACE

  • Construction

    Issued May 14, 2025 — PARTIAL VACATE ORDER:OBSERVED CRACKED/SPALLED UNDERSIDE CONCRETE SLAB BALCONY AT EXPO 1 & 3, WEST & EAST ELEVATION OF ALL BALCONY LINES REMEDY: VACATE ALL BALCONY AT ALL 4 EXPOSURES, WEST, NORTH, EAST & SOUTH ELEVATIONS

  • Failure to correct swarmp conditions (facade)

    Issued Feb 24, 2021 — NYCHA CYCLE 8A FAILURE TO CORRECT SWARMP CONDITIONS

  • 1 further open notice is on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 3328126. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 16 alteration filing. Its latest status categories are 9 recorded as completed, 6 approved, 1 closed or withdrawn. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Apr 4, 2019
Latest recorded change
Aug 25, 2026
Highest proposed story count
14 stories
Highest proposed unit count
112 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 430 Dumont Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 16 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Installation of new sidewalk shed at 430 dumont avenue as indicated on plans. there will be no change in the use, egress, or occupancy under this application. Filing B00148159-I1.

    01
  2. Permit recorded for alteration

    DOB lists a first permit date for B00148159-I1. That is not by itself confirmation of activity on site.

    02
  3. Alteration filed

    Modifications to existing SP system at cellar, install new 15 sp heads, 1 new control valve at cel. Filing B00214579-I1.

    03
  4. Alteration approved

    Filing B00214579-I1 reached an approved status.

    04
  5. Alteration filed

    Project involves the installation of an on site storm water drainage retention system. the system uses underground chambers to temporarily store flow in accordance with the NYC dep green infrastructure program. Filing B00289745-I1.

    05
  6. Alteration filed

    Installation of temporary construction fence at 430 dumont avenue, brooklyn as indicated on plans. there will be no change in the use, egress, or occupancy under this application. Filing B00353111-I1.

    06
  7. Alteration approved

    Filing B00353111-I1 reached an approved status.

    07
  8. Permit recorded for alteration

    DOB lists a first permit date for B00353111-I1. That is not by itself confirmation of activity on site.

    08
  9. Alteration approved

    Filing B00289745-I1 reached an approved status.

    09
  10. Alteration filed

    Project involves the installation of on site storm water drainage retention systems. The systems use underground chambers to temporarily store flow in accordance with the NYC DEP Green Infrastructure Program. Filing B00481598-I1.

    010
  11. Alteration filed

    Project involves the installation of on site storm water drainage retention systems. The systems useunderground chambers to temporarily store flow in accordance with the nyc dep green infrastructure program. Filing B00487371-I1.

    011
  12. Alteration approved

    Filing B00487371-I1 reached an approved status.

    012
  13. Alteration filed

    Project involves the installation of an on site storm water drainage retention system. the system uses underground chambers to temporarily store flow in accordance with the NYC dep green infrastructure program. Filing B00289745-P1.

    013
  14. Alteration approved

    Filing B00481598-I1 reached an approved status.

    014
  15. Alteration approved

    Filing B00289745-P1 reached an approved status.

    015
  16. Alteration now approved

    The latest status recorded for B00289745-P1 is “Approved.”

    016
  17. Alteration filed

    Mechanical work for central boiler plant and domestic hot water system replacement (van dyke bldg #23) as per the plans filed herewith. Filing B00463467-I1.

    017
  18. Alteration filed

    Nycha boiler- plumbing work as per plans filed herewith. no change to use, egress or occupancy. Filing B00463123-I1.

    018
  19. Alteration approved

    Filing B00463467-I1 reached an approved status.

    019
  20. Alteration filed

    General construction in the cellar as per plans filed herewith. no change to use, egress, or occupancy. Filing B00458429-I1.

    020
  21. Alteration approved

    Filing B00458429-I1 reached an approved status.

    021
  22. Permit recorded for alteration

    DOB lists a first permit date for B00289745-I1. That is not by itself confirmation of activity on site.

    022
  23. Permit recorded for alteration

    DOB lists a first permit date for B00481598-I1. That is not by itself confirmation of activity on site.

    023
  24. Alteration filed

    Installation of temporary construction fence 200 lf, at 430 dumont avenue, brooklyn, as indicated on plans. there will be no change in the use, egress, or occupancy under this application. Filing B00535600-I1.

    024
  25. Alteration approved

    Filing B00535600-I1 reached an approved status.

    025
  26. Permit recorded for alteration

    DOB lists a first permit date for B00535600-I1. That is not by itself confirmation of activity on site.

    026
  27. Permit recorded for alteration

    DOB lists a first permit date for B00487371-I1. That is not by itself confirmation of activity on site.

    027
  28. Alteration filed

    Nycha boiler-structrual work in the cellar floor as per plans filed herewith. no change in use, egress or occupancy. Filing B00461906-I1.

    028
  29. Alteration approved

    Filing B00461906-I1 reached an approved status.

    029
  30. Alteration approved

    Filing B00463123-I1 reached an approved status.

    030
  31. Alteration filed

    Installation of temporary construction fence as per plans filed herewith. no change to use, egress or occupancy. Filing B00587591-I1.

    031
  32. Permit recorded for alteration

    DOB lists a first permit date for B00587591-I1. That is not by itself confirmation of activity on site.

    032
  33. Alteration filed

    Installation of temporary construction fence as per plans filed herewith. no change to use, egress or occupancy. Filing B00587591-P1.

    033
  34. Alteration approved

    Filing B00587591-P1 reached an approved status.

    034
  35. Alteration now approved

    The latest status recorded for B00587591-P1 is “Approved.”

    035
  36. Alteration signed off

    DOB recorded a sign-off for B00587591-I1.

    036
  37. Alteration now completed

    The latest status recorded for B00587591-I1 is “LOC Issued.”

    037
  38. Alteration signed off

    DOB recorded a sign-off for B00289745-I1.

    038
  39. Alteration now completed

    The latest status recorded for B00289745-I1 is “LOC Issued.”

    039
  40. Alteration signed off

    DOB recorded a sign-off for B00487371-I1.

    040
  41. Alteration now completed

    The latest status recorded for B00487371-I1 is “LOC Issued.”

    041
  42. Alteration signed off

    DOB recorded a sign-off for B00481598-I1.

    042
  43. Alteration now completed

    The latest status recorded for B00481598-I1 is “LOC Issued.”

    043
  44. Alteration signed off

    DOB recorded a sign-off for B00535600-I1.

    044
  45. Alteration now completed

    The latest status recorded for B00535600-I1 is “LOC Issued.”

    045
  46. Permit recorded for alteration

    DOB lists a first permit date for B00463467-I1. That is not by itself confirmation of activity on site.

    046
  47. Permit recorded for alteration

    DOB lists a first permit date for B00458429-I1. That is not by itself confirmation of activity on site.

    047
  48. Permit recorded for alteration

    DOB lists a first permit date for B00463123-I1. That is not by itself confirmation of activity on site.

    048
  49. Permit recorded for alteration

    DOB lists a first permit date for B00461906-I1. That is not by itself confirmation of activity on site.

    049
  50. Alteration filed

    Nycha boiler- plumbing work as per plans filed herewith. no change to use, egress or occupancy. Filing B00463123-P1.

    050
  51. Alteration approved

    Filing B00463123-P1 reached an approved status.

    051
  52. Alteration now approved

    The latest status recorded for B00463123-P1 is “Approved.”

    052
  53. Alteration now approved

    The latest status recorded for B00461906-I1 is “Permit Entire.”

    053
  54. Alteration signed off

    DOB recorded a sign-off for B00148159-I1.

    054
  55. Alteration signed off

    DOB recorded a sign-off for B00353111-I1.

    055
  56. Alteration now completed

    The latest status recorded for B00148159-I1 is “LOC Issued.”

    056
  57. Alteration now completed

    The latest status recorded for B00353111-I1 is “LOC Issued.”

    057
  58. Alteration now closed

    The latest status recorded for B00214579-I1 is “Filing Withdrawn.”

    058
  59. Alteration filed

    Nycha boiler- plumbing work as per plans filed herewith. no change to use, egress or occupancy. Filing B00463123-P2.

    059
  60. Alteration now approved

    The latest status recorded for B00463123-I1 is “Permit Entire.”

    060
  61. Alteration approved

    Filing B00463123-P2 reached an approved status.

    061
  62. Alteration now approved

    The latest status recorded for B00463123-P2 is “Approved.”

    062
  63. Alteration signed off

    DOB recorded a sign-off for B00458429-I1.

    063
  64. Alteration now completed

    The latest status recorded for B00458429-I1 is “LOC Issued.”

    064
  65. Alteration signed off

    DOB recorded a sign-off for B00463467-I1.

    065
  66. Alteration now completed

    The latest status recorded for B00463467-I1 is “LOC Issued.”

    066