What the filing says
A public-record reading of the proposed work.
Installation of temporary construction fence 200 lf, at 430 dumont avenue, brooklyn, as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 14-story elevator apartment building built in 1948, with 591 homes, on a 323,438 sq ft lot.
- Built
- 1948
- Floors
- 14
- Residential units
- 591
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R6
- Lot area
- 323,438 sq ft
- Building area
- 458,572 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 23 notices on file; the most recent was issued Jun 2, 2025.
- Construction
Issued Jun 2, 2025 — FAILURE TO MAINTAIN BUILDING EXTERIOR FACADE IN A CODE COMPLIANT MANNER. AT TIME OF INSPECTION IT WAS OBSERVED BALCONIES AT EXOSURES 1 & 3 (WEST & EAST ELEVATION) CRACKED, SPALLING AND EXPOSED REBARS AT MULTIPLE LOCATION. REMEDY: REPAIR AND/OR REPLACE
- Construction
Issued May 14, 2025 — PARTIAL VACATE ORDER:OBSERVED CRACKED/SPALLED UNDERSIDE CONCRETE SLAB BALCONY AT EXPO 1 & 3, WEST & EAST ELEVATION OF ALL BALCONY LINES REMEDY: VACATE ALL BALCONY AT ALL 4 EXPOSURES, WEST, NORTH, EAST & SOUTH ELEVATIONS
- Failure to correct swarmp conditions (facade)
Issued Feb 24, 2021 — NYCHA CYCLE 8A FAILURE TO CORRECT SWARMP CONDITIONS
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00535600-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 67,630 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00535600-I1
- BBL
- 3037940001
- Postal code
- 11212 · 2136 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0