What the filing says
A public-record reading of the proposed work.
Installtion of a temporary construction fence as per plans submitted in conjunction with nb construction. no change in use, egress or occupancy. fence to comply with chapter 33 of NYC building code of 2014.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a vacant land on a 1,365 sq ft lot.
- Last altered
- 2021
- Residential units
- 0
- Building type
- Vacant land
- Land use
- Vacant land
- Zoning district
- M1-1
- Lot area
- 1,365 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 2 notices on file; the most recent was issued May 26, 2021.
- Construction
Issued May 26, 2021 — FAILURE TO MAINTAIN BLDG IN SAFE CONDN:DUE TO FIRE THAT TOOK PLACE ON 05/15/21,THE BLDG HAS THE EXP#2 AND ROOF PARTLY COLLAPSED INSIDE THE BLDG.EXTERIOR WALLS ARE IMPROPERLY BRACED REPRESENTING DANGER TO THE PUBLIC.OWNR TO ENGAGE NYSPE&ENDORSED CONTRACTR TO FULLY DEMO BLDG&GRDE SITE.DEMO PERMT TO BE OBT'D N/L/T 07/15/21.SIGNOFF JOB N/L/T 08/02/21
- Construction
Issued May 15, 2021 — DUE TO FIRE
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00516351-S1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00516351-S1
- BBL
- 3031590032
- Postal code
- 11237 · 1737 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0








