What the filing says
A public-record reading of the proposed work.
Per DOB approved emergency work, partial demolition of the unsafe roof, third floor and second floor caused by fire damage. This application is filed to address V010626CFEU40201BS. No change to use, occupancy or egress.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2.5-story two-family home built in 1910, on a 1,900 sq ft lot.
- Built
- 1910
- Floors
- 2.5
- Residential units
- 2
- Building type
- Two-family home
- Land use
- One and two family homes
- Zoning district
- R4-1
- Lot area
- 1,900 sq ft
- Building area
- 1,254 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 29, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 4 notices on file; the most recent was issued Jan 6, 2026.
- Construction
Issued Jan 6, 2026 — FAILURE TO MAINTAIN DUE TO FIRE.BLDG SFFRD A 2-ALARM FIRE ON 1/5/26& SUSTAIND STRCTE DMG APPRX 80% OF TOP STRY&ROOF PRTLLY CLLPSD BLDG PRTLLY DEMO'D TO 2NDFL LVL&STBLZE UNDR EMERGENCY WORK.1.NYSPE STRCT ENG TO IMMED EVAL ENT BLDG&DSGN RPAIRS,2.FILE FOR RPAIRS BY 7/6/26,3 OBTN PRMTS&STRT WRK BY 7/20/26
- Construction
Issued Jan 6, 2026 — STRUCTURE RENDERED NON-COMPLIANT DUE TO FIRE THROUGHOUT THE PREMISES WHICH HAS CAUSED EXTENSIVE FIRE, WATER AND SMOKE DAMAGE. ALSO LEAVING STRUCTURE OPEN TO THE ELEMENTS.
- Construction
Issued Jan 6, 2026 — EMERGENCY WORK.BLDG SFFRD A 2ALARM FIRE ON 1/5/26&SUSTAINED STRCTRL DMG.APPRX 80% OF TOP STRY&ROOF PRTLLY CLLPSD.ENTIRE 3RDFL&ALL 2ND STRY WALLS FIRE DMGD W/APPRX 25% OF 3RDFL PRTLLY CLLPSD.LOCK AREAS.1.IMMED FULLY DEMO BLDG,2.ALL WRK TO BE DRCTLY SPRVSD&DRECTD BY ONSITE NYS PE STRCTRL ENG&PERFRMD BY DEMO ENDRSD CNTRCTR
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 29, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01346727-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 91,066 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01346727-I1
- BBL
- 4023250012
- Postal code
- 11377 · 376 filings
- Review type
- Standard Plan Examination
- Existing stories
- 2
- Proposed stories
- 2
- Existing dwelling units
- 1
- Proposed dwelling units
- 1