What the filing says
A public-record reading of the proposed work.
Interior renovation to combine apt 2j and 3j. partition changes to non-load-bearing walls as per plans. no change in use, occupancy, or egress.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 16-story elevator apartment building built in 1956, with 219 homes, on a 22,988 sq ft lot.
- Built
- 1956
- Floors
- 16
- Residential units
- 219
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R10A
- Lot area
- 22,988 sq ft
- Building area
- 238,293 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 15, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 5 open notices on record for this building, out of 62 notices on file; the most recent was issued Oct 24, 2025.
- Construction
Issued Oct 24, 2025 — NOTED: ILLEGAL CONVERSION OF ROOF TOP DECK FOR RECREATIONAL USE. EMAIL ENGINEERING REPORT TO MNCONSTENF@BUILDINGS.NYC.GOV
- Failure to submit
Issued Jun 23, 2024 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2023
- Construction
Issued Jul 25, 2023 — AT TIME OF INSPECTION OBSERVED BASEMENT LEVEL PARKING GARAGE CONCRETE CEILING AND WALL INSTATE OF DISREPAIR CONDITIONS WITH CRACKS, SPALLING, SECTION MISSING AND EXPOSED REBARS THROUGHOUT. ALSO OBSERVED WATER DAMAGES UNDER THE CONCRETE RAMP AND TEMPORARY COVERED WITH TARP.
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 15, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01419245-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 80,574 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01419245-I1
- BBL
- 1014730018
- Postal code
- 10075 · 347 filings
- Review type
- Professional Certification
- Existing stories
- 16
- Proposed stories
- 16
- Existing dwelling units
- 216
- Proposed dwelling units
- 215