NYC DOB record · M01419245-I1

440 East 79 Street

440 East 79 Street, Manhattan, NY 10075

Alteration filing in Upper East Side-Lenox Hill-Roosevelt Island, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 15, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01419245-I1

440 East 79 Street

Manhattan, NY 10075

Alteration filing · status dated Oct 13, 2026

Current record
Approved
Proposed scale
16 stories
Dwelling units
215
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01419245-I1 as a alteration filing at 440 East 79 Street, Manhattan, NY 10075. Its latest published status category is Approved, dated Oct 13, 2026. The filing records 16 proposed stories and 215 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 13, 2026
Proposed scale
16 proposed stories and 215 proposed dwelling units
The building, not the filingopen housing violations, what it sold for and every filing at BIN 1046026Applicant of recordSee the 122 filings that name Atelier New York Architecture
FiledJul 1, 2026
Current recordApproved
Proposed scale16 stories
Recorded cost$149,600

What the filing says

A public-record reading of the proposed work.

Interior renovation to combine apt 2j and 3j. partition changes to non-load-bearing walls as per plans. no change in use, occupancy, or egress.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 16-story elevator apartment building built in 1956, with 219 homes, on a 22,988 sq ft lot.

Built
1956
Floors
16
Residential units
219
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R10A
Lot area
22,988 sq ft
Building area
238,293 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 15, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 5 open notices on record for this building, out of 62 notices on file; the most recent was issued Oct 24, 2025.

  • Construction

    Issued Oct 24, 2025 — NOTED: ILLEGAL CONVERSION OF ROOF TOP DECK FOR RECREATIONAL USE. EMAIL ENGINEERING REPORT TO MNCONSTENF@BUILDINGS.NYC.GOV

  • Failure to submit

    Issued Jun 23, 2024 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2023

  • Construction

    Issued Jul 25, 2023 — AT TIME OF INSPECTION OBSERVED BASEMENT LEVEL PARKING GARAGE CONCRETE CEILING AND WALL INSTATE OF DISREPAIR CONDITIONS WITH CRACKS, SPALLING, SECTION MISSING AND EXPOSED REBARS THROUGHOUT. ALSO OBSERVED WATER DAMAGES UNDER THE CONCRETE RAMP AND TEMPORARY COVERED WITH TARP.

  • 2 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 15, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01419245-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 80,574 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01419245-I1
BBL
1014730018
Review type
Professional Certification
Existing stories
16
Proposed stories
16
Existing dwelling units
216
Proposed dwelling units
215
General construction