What the filing says
A public-record reading of the proposed work.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the NYC building code. no change in use, occupancy, or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1928, with 193 homes, on a 52,200 sq ft lot.
- Built
- 1928
- Last altered
- 1982
- Floors
- 6
- Residential units
- 193
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R7-1
- Lot area
- 52,200 sq ft
- Building area
- 195,726 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 38 open notices on record for this building, out of 160 notices on file; the most recent was issued Apr 14, 2026.
- Construction
Issued Apr 14, 2026 — STRUCTURE RENDERED NONCOMPLIANT. ATOI OBSERVED IN APT C26 SMOKE DAMAGE AND CEILINGS REMOVED IN INTERIOR. WINDOW OUT AT FIRE ESCAPE MAINTAIN APT C26 IN CODE COMPLIANT MANNER. VACATE APT C26
- Construction
Issued May 9, 2022 — EMERGENCY WORK ORDER DUE TO MISSING,BROKEN FIRE ESCAPE STEPS/THREADS OBSERVED MISSING STEP/THREAD&BROKEN STEP(MISSING FASTENERS)ON FIRE ESCAPE. REMEDY:IMMEDIATELY REPAIR AND REPLACE ANY MISSING,UNSTABLE OR BROKEN FIRE ESCAPE THREADS AT THE ENTIRE BUILDING UNDER SUPERVISION OF A DESIGN PROFESSIONAL
- Construction
Issued Jan 8, 2022
35 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00309627-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded04
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00309627-I1
- BBL
- 3013250001
- Postal code
- 11225 · 1516 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 193
- Proposed dwelling units
- 193