What the filing says
A public-record reading of the proposed work.
Crack brick repair , eroded masonry to be replaced, window lintel to be repaired or replaced as per plan. no change in use, egress or occupancy with this application
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1928, with 193 homes, on a 52,200 sq ft lot.
- Built
- 1928
- Last altered
- 1982
- Floors
- 6
- Residential units
- 193
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R7-1
- Lot area
- 52,200 sq ft
- Building area
- 195,726 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 38 open notices on record for this building, out of 160 notices on file; the most recent was issued Apr 14, 2026.
- Construction
Issued Apr 14, 2026 — STRUCTURE RENDERED NONCOMPLIANT. ATOI OBSERVED IN APT C26 SMOKE DAMAGE AND CEILINGS REMOVED IN INTERIOR. WINDOW OUT AT FIRE ESCAPE MAINTAIN APT C26 IN CODE COMPLIANT MANNER. VACATE APT C26
- Construction
Issued May 9, 2022 — EMERGENCY WORK ORDER DUE TO MISSING,BROKEN FIRE ESCAPE STEPS/THREADS OBSERVED MISSING STEP/THREAD&BROKEN STEP(MISSING FASTENERS)ON FIRE ESCAPE. REMEDY:IMMEDIATELY REPAIR AND REPLACE ANY MISSING,UNSTABLE OR BROKEN FIRE ESCAPE THREADS AT THE ENTIRE BUILDING UNDER SUPERVISION OF A DESIGN PROFESSIONAL
- Construction
Issued Jan 8, 2022
35 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00504786-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00504786-I1
- BBL
- 3013250001
- Postal code
- 11225 · 1078 filings
- Review type
- Professional Certification
- Existing stories
- 6
- Proposed stories
- 6
- Existing dwelling units
- 193
- Proposed dwelling units
- 193








