NYC DOB record · B00504786-I1

446 Kingston Avenue

446 Kingston Avenue, Brooklyn, NY 11225

Alteration filing in Prospect Lefferts Gardens-Wingate, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00504786-I1

446 Kingston Avenue

Brooklyn, NY 11225

Alteration filing · status dated Jul 26, 2022

Current record
Approved
Proposed scale
6 stories
Dwelling units
193
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00504786-I1 as a alteration filing at 446 Kingston Avenue, Brooklyn, NY 11225. Its latest published status category is Approved, dated Jul 26, 2022. The filing records 6 proposed stories and 193 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Jul 26, 2022
Proposed scale
6 proposed stories and 193 proposed dwelling units
Complete building dossierView all 2 filings associated with BIN 3035179Applicant of recordSee the 1464 filings that name Green Design
FiledApr 29, 2021
Current recordApproved
Proposed scale6 stories
Recorded cost$21,000

What the filing says

A public-record reading of the proposed work.

Crack brick repair , eroded masonry to be replaced, window lintel to be repaired or replaced as per plan. no change in use, egress or occupancy with this application

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story elevator apartment building built in 1928, with 193 homes, on a 52,200 sq ft lot.

Built
1928
Last altered
1982
Floors
6
Residential units
193
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R7-1
Lot area
52,200 sq ft
Building area
195,726 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 38 open notices on record for this building, out of 160 notices on file; the most recent was issued Apr 14, 2026.

  • Construction

    Issued Apr 14, 2026 — STRUCTURE RENDERED NONCOMPLIANT. ATOI OBSERVED IN APT C26 SMOKE DAMAGE AND CEILINGS REMOVED IN INTERIOR. WINDOW OUT AT FIRE ESCAPE MAINTAIN APT C26 IN CODE COMPLIANT MANNER. VACATE APT C26

  • Construction

    Issued May 9, 2022 — EMERGENCY WORK ORDER DUE TO MISSING,BROKEN FIRE ESCAPE STEPS/THREADS OBSERVED MISSING STEP/THREAD&BROKEN STEP(MISSING FASTENERS)ON FIRE ESCAPE. REMEDY:IMMEDIATELY REPAIR AND REPLACE ANY MISSING,UNSTABLE OR BROKEN FIRE ESCAPE THREADS AT THE ENTIRE BUILDING UNDER SUPERVISION OF A DESIGN PROFESSIONAL

  • Construction

    Issued Jan 8, 2022

  • 35 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00504786-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00504786-I1
BBL
3013250001
Review type
Professional Certification
Existing stories
6
Proposed stories
6
Existing dwelling units
193
Proposed dwelling units
193
General construction