What the filing says
A public-record reading of the proposed work.
Exterior Facade repairs as per the plans filed including: Removal and replacement of cracked/spalled masonry units, joint sealant, terra-cotta units, steel lintels, precast coping and window frame parts. Masonry Re-Pointing.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 16-story office building built in 1923, on a 8,158 sq ft lot.
- Built
- 1923
- Last altered
- 1983
- Floors
- 16
- Residential units
- 0
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- C6-4.5
- Lot area
- 8,158 sq ft
- Building area
- 108,929 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 31, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 21 open notices on record for this building, out of 142 notices on file; the most recent was issued May 13, 2024.
- Hazardous condition (facade)
Issued May 13, 2024 — CYCLE 9C UNSAFE REPORT FILED
- Failure to correct swarmp conditions (facade)
Issued May 13, 2024 — CYCLE 9C FAILURE TO CORRECT SWARMP CONDITIONS
- No report and / or late filing (facade)
Issued Feb 22, 2024 — FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
18 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 31, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01097787-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 90,393 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01097787-I1
- BBL
- 1012610016
- Postal code
- 10036 · 935 filings
- Review type
- Professional Certification
- Existing stories
- 16
- Proposed stories
- 16
- Existing dwelling units
- 0
- Proposed dwelling units
- 0