What the filing says
A public-record reading of the proposed work.
Heavy duty sidewalk shed required for deteriorated exterior building facade. sidewalk shed shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story educational building built in 1958, on a 28,985 sq ft lot.
- Built
- 1958
- Floors
- 6
- Residential units
- 0
- Building type
- Educational building
- Land use
- Public facilities and institutions
- Zoning district
- C6-3
- Lot area
- 28,985 sq ft
- Building area
- 168,570 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 7, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 9 open notices on record for this building, out of 22 notices on file; the most recent was issued Nov 14, 2025.
- Low pressure boiler
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
- Low pressure boiler
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
- Construction
Issued May 7, 2025 — FAILURE TO MAINTAIN BLDG EXTERIOR FACADE AND/OR APPURTENANCES IN CODE COMPLIANT MANNER. CRACKED/BROKEN WINDOWS THROUGHOUT BLDG.CRACKS ON BRICK VENEER. SPALLED BRICK & LINTEL/SILLS STONE W/EXPOSED REBARS @ MULTIPLE LOCATIONS. EXPOSURE 2 MISSING BRICK WAS OBSERVED. REMEDY: REPAIR AND/OR REPLACE
6 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 7, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01400406-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01400406-I1
- BIN
- 1026319
- BBL
- 1010500006
- Postal code
- 10018 · 403 filings
- Review type
- Professional Certification
- Existing stories
- 6
- Proposed stories
- 6
- Existing dwelling units
- 0
- Proposed dwelling units
- 0