NYC DOB record · B00394128-I1

452 87 Street

452 87 Street, Brooklyn, NY 11209

Alteration filing in Bay Ridge, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 12, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00394128-I1

452 87 Street

Brooklyn, NY 11209

Alteration filing · status dated Jan 5, 2022

Current record
Recorded as completed
Proposed scale
5 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00394128-I1 as a alteration filing at 452 87 Street, Brooklyn, NY 11209. Its latest published status category is Recorded as completed, dated Jan 5, 2022. The filing records 5 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Jan 5, 2022
Proposed scale
5 proposed stories
Complete building dossierView all 4 filings associated with BIN 3153755Applicant of recordSee the 1 filings that name Laufs Engineering Design
FiledSep 2, 2020
Current recordRecorded as completed
Proposed scale5 stories
Recorded cost$20,000

What the filing says

A public-record reading of the proposed work.

Stabilization of existing columns and facade at 5th floor , repair facade to comply with stated issued violation. No change of use egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story place of public assembly built in 1923, on a 6,255 sq ft lot.

Built
1923
Last altered
1975
Floors
6
Residential units
0
Building type
Place of public assembly
Land use
Public facilities and institutions
Zoning district
C8-2
Lot area
6,255 sq ft
Building area
24,779 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 29 open notices on record for this building, out of 76 notices on file; the most recent was issued Apr 22, 2025.

  • Construction

    Issued Apr 22, 2025 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AT TIME OF INS PECTION,OBSERVED AT EXP1 AND 2 NORTH AND EAST ELEV,CRACKED BRICK FACAD E,DETERIORATED MORTAR JOINT,SPALLING BRICK.AT EXP2 EAST ELEV,MISSING B RICKS AND LOOSE COPING PIECES.AT EXP4 WEST ELEV,SPALLING BRICK,DETERIO RATED WOOD ROOF OF TERRACE.REMEDY:REPAIR AND/OR REPLACE

  • Construction

    Issued Oct 30, 2024 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED DETERIORATING MASONRY INCLUDING STEP CRACKS VERTICAL CRACKS, MISSING MOTAR JOINTS/MISSING BRICK. AT ENTRANCE AWNING HAS HOLES AND IS RUSTED AT ROOF LEVEL OBSERVED OPENING IN ROOF SECTION, BOARDED UP WINDOW. ALL CONDITIONS @ EXPOSURES. REMEDY: REPAIR AND/OR REPLACE

  • Construction

    Issued Jun 5, 2024 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.OBSERVED DETER IORATING MASONRY INCLUDING STEP CRACKS,VERTICAL CRACKS,MISSING/OPEN SE CTION OF BRICKS ON ALL EXPOSURES.ALSO OBSERVED MISSING WINDOW PANELS,B ROKEN RAILING AT PARAPET LEVEL ON EXP1 NORTH ELEV.REMEDY:FIX AND/OR RE PLACE

  • 26 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00394128-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00394128-I1
BBL
3060500028
Review type
Professional Certification
Existing stories
5
Proposed stories
5
Existing dwelling units
0
Proposed dwelling units
0
Structural work