What the filing says
A public-record reading of the proposed work.
Facade stabilization, repair masonry, fill masonry cracks, re pointing of bricks, and provide safety netting. No change of use, egress or occupancy
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story place of public assembly built in 1923, on a 6,255 sq ft lot.
- Built
- 1923
- Last altered
- 1975
- Floors
- 6
- Residential units
- 0
- Building type
- Place of public assembly
- Land use
- Public facilities and institutions
- Zoning district
- C8-2
- Lot area
- 6,255 sq ft
- Building area
- 24,779 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 29 open notices on record for this building, out of 76 notices on file; the most recent was issued Apr 22, 2025.
- Construction
Issued Apr 22, 2025 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AT TIME OF INS PECTION,OBSERVED AT EXP1 AND 2 NORTH AND EAST ELEV,CRACKED BRICK FACAD E,DETERIORATED MORTAR JOINT,SPALLING BRICK.AT EXP2 EAST ELEV,MISSING B RICKS AND LOOSE COPING PIECES.AT EXP4 WEST ELEV,SPALLING BRICK,DETERIO RATED WOOD ROOF OF TERRACE.REMEDY:REPAIR AND/OR REPLACE
- Construction
Issued Oct 30, 2024 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED DETERIORATING MASONRY INCLUDING STEP CRACKS VERTICAL CRACKS, MISSING MOTAR JOINTS/MISSING BRICK. AT ENTRANCE AWNING HAS HOLES AND IS RUSTED AT ROOF LEVEL OBSERVED OPENING IN ROOF SECTION, BOARDED UP WINDOW. ALL CONDITIONS @ EXPOSURES. REMEDY: REPAIR AND/OR REPLACE
- Construction
Issued Jun 5, 2024 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.OBSERVED DETER IORATING MASONRY INCLUDING STEP CRACKS,VERTICAL CRACKS,MISSING/OPEN SE CTION OF BRICKS ON ALL EXPOSURES.ALSO OBSERVED MISSING WINDOW PANELS,B ROKEN RAILING AT PARAPET LEVEL ON EXP1 NORTH ELEV.REMEDY:FIX AND/OR RE PLACE
26 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00450490-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00450490-I1
- BBL
- 3060500028
- Postal code
- 11209 · 1283 filings
- Review type
- Professional Certification
- Existing stories
- 5
- Proposed stories
- 5
- Existing dwelling units
- 0
- Proposed dwelling units
- 0








