NYC DOB record · Q00902019-I1

46-19 70 Street

46-19 70 Street, Queens, NY 11377

Alteration filing in Woodside, Queens. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 17, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q00902019-I1

46-19 70 Street

Queens, NY 11377

Alteration filing · status dated Sep 15, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
1
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q00902019-I1 as a alteration filing at 46-19 70 Street, Queens, NY 11377. Its latest published status category is Approved, dated Sep 15, 2026. The filing records 1 proposed dwelling unit.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 15, 2026
Proposed scale
1 proposed dwelling unit
Applicant of recordSee the 57 filings that name Edward C. Hicks RA
FiledJul 10, 2023
Current recordApproved
Proposed scale1 units
Recorded cost$3,000

What the filing says

A public-record reading of the proposed work.

Installation of temporary construction wood fence. No change in occupancy, use or egress under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story walk-up apartment building built in 1930, with 3 homes, on a 4,350 sq ft lot.

Built
1930
Floors
2
Residential units
3
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R7X
Lot area
4,350 sq ft
Building area
1,792 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 17, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 5 notices on file; the most recent was issued Oct 1, 2025.

  • Construction

    Issued Oct 1, 2025 — FAILURE TO MAINTAIN.AT TIME OF INSPECTION,OBSRVD BLDG IN A STATE OF DISREPAIR W/ROOF OF MEMBRANE RMVD&BLDG OPEN TO THE ELEMENTS.WOODFRAME IS DETERIORATD DUE TO LONG TRM EXPSRE TO THE ELEMENTS.COMPLY WITH COMMISSIONER'S ORDER:DOB VIOLATION #080825FEU40201AK (CONTROL 3341591) IMMEDIATELY

  • Unsafe

    Issued Aug 8, 2025

  • Construction

    Issued Aug 8, 2025 — FAILURE TO MAINTAIN.AT TIME OF INSPECTION,OBSRVD BLDG IN A STATE OF DISREPAIR W/ROOF MEMBRANE RMVD&BLDG OPEN TO THE ELEMNTS.WOODFRAME IS DETERIORATD DUE TO LONG TRM EXPSRE TO THE ELEMENTS.OWNR TO ENGAGE NYSPE&ENDRSD CNTRCTR TO EVAL THE ENT BLDG&RPAIR OR DEMO UNDR PRMT W/ PRMTS OBTAIND BY 9/22/25.SGN OFF

  • 1 further open notice is on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q00902019-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 70,325 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q00902019-I1
BIN
4432230
BBL
4024440002
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
1
Proposed dwelling units
1