What the filing says
A public-record reading of the proposed work.
Installation of a temporary heavy-duty sidewalk shed and shoring per the plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story elevator apartment building built in 1871, with 8 homes, on a 5,023 sq ft lot.
- Built
- 1871
- Last altered
- 2008
- Floors
- 5
- Residential units
- 8
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- M1-5/R7X
- Lot area
- 5,023 sq ft
- Building area
- 22,207 sq ft
- Historic district
- SoHo-Cast Iron Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 22, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 6 open notices on record for this building, out of 24 notices on file; the most recent was issued Jul 3, 2024.
- Construction
Issued Jul 3, 2024 — FAILURE TO MAINTAIN.MULT LOCATIONS OF PENTHOUSE STEEL FRAMNG CONNECTIONS W/TC BOLTS NOT FULLY TENSIONED.NEW STAIR CONNECTNG ROOF OF 461 TO 463 ROOF FOR ACCESS TO SHARD FIRE ESCAPE ROOF ACCESS NOT CNTRCT 1.NYS RA/APPLICNT OR RECORD&NYSPE/SPECIAL INSPECTR TO IMMED EVAL ALL CNDITIONS@PENTHOUSE&DSGN REMEDIAL WRK
- Construction
Issued Jul 3, 2024 — FAILURE TO MAINTAIN.BLDG SFFRD A 3-ALARM FIRE ON 6/20/24 AT ROOF/PENTHOUSE LEVELS.ENTIRE PENTHOUSE&ELEVATED COMPOSITE WOOD DECKFIRE DMGD.SAGGNG STEEL BEAMS,BROKEN BEAM CONNECTION&MELTD/MSSNG DECKNG.1.NYSPE STRCTRL ENG TO IMMED EVAL ENT BLDG&DSGN RPAIRS,2.FILE FOR RPAIRS BY 9/16/24,3.OBTN PRMTS&STRT RPAIRS BY 9/30/24
- Construction
Issued Jul 3, 2024 — EMERG WRK BLDG SUFFRD 3 ALRM FIRE ON 6/20/24,ROOF PENTHSE LEVEL ENTIRE PENTHSE,COMPOSITE WOOD DECK-FIRE DMG.ROOF BELOW PENTHSE FRAME FIRE DMG WITH CHARRED ROOF AND JOIST WITH MULTIPLE OPENINGS.IMMED INSTL TEMP ROOF BARRIERS&FRAME &TEMP REAR&ROOF TOP STRT @461 BROOME ST ROOF @ DRCTN OF NYSPE,RPR DMGD'D PARAPET
3 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 11, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01434219-I1.
- Current status updated02
The latest recorded filing status is “Prof Cert QA Review.”
For scale: half of DOB filings are permitted within 23 days of being filed and a quarter take longer than 4 months, measured across 99,692 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01434219-I1
- BIN
- 1007034
- BBL
- 1004740010
- Postal code
- 10013 · 1208 filings
- Review type
- Professional Certification
- Existing stories
- 5
- Proposed stories
- 5
- Existing dwelling units
- 4
- Proposed dwelling units
- 4