What the filing says
A public-record reading of the proposed work.
Installation of outrigger for the facade repair work as per plan submitted.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1930, with 61 homes, on a 16,100 sq ft lot.
- Built
- 1930
- Last altered
- 1985
- Floors
- 6
- Residential units
- 61
- Building type
- Elevator apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- R6
- Lot area
- 16,100 sq ft
- Building area
- 72,000 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 18, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 18 open notices on record for this building, out of 60 notices on file; the most recent was issued Jul 22, 2026.
- Construction
Issued Jul 22, 2026 — FAILURE TO COMPLY WITH COMMISSIONER'S ORDER:DOB VIOLATION # 070826CFEU31201AK(CONTROL#350671)WHICH REQUIRES OWNER TO IMMED STBLZE OR DEMO UNSTABLE PARAPET WALLS UNDR EMRGNCY WRK,W/MEANS&METHDS SUBMITD BY NYSPE TO FEU FOR APPRVL PRIOR TO STRT OF EMRGNCY WRK.AS OF 7/22/26, NO MEANS&METHDS FOR EMRGNCY WRK HAS BEEN SUBMITTD TO FEU.COMPLY W/COMM
- Construction
Issued Jul 8, 2026 — EMERGENCY WORK ORDER.PER ROB RECORDS,FACADE IS IN A STATE OF DSPAIR W/ CRCKS,SPALLNG,SHIFTD MASNRY BULGNG&LEANING WALLS.PARAPET WALLS ARE IN A STATE OF DSRPAIR,PRTICULARLY@TALL SECTIONS OF PARAPET.OWNR TO IMMED ENGAGE NYSPE&ENDRSD CNTRCTR TO IMMED INSTALL PUBLC&ADJ PROP PROTECTIONS/SFTY MEASURES AS REQ'D
- Construction
Issued Jul 8, 2026 — FAILURE TO MAINTAIN.PER DOB RECORDS,FACADE IS IN A STATE OF DSRPAIR W/ CRCKS,SPALLNG,SHFTD MASONRY,BULGNG,&LEANING WALLS ARE IN A SEVERE STATE OF DSRPAIR,PARTICULARLY@TALL SECTIONS.OWNR TO ENGAGE NYSPE& ENDRSD CNTRCTR TO EVAL THE ENT FACADE& PERM RPAIR UNDR PRMT.FILE FOR PRMTS BY 9/8/26.SGN OFF RPAIR
15 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 18, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01449214-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01449214-I1
- BIN
- 3137193
- BBL
- 3056280001
- Postal code
- 11219 · 2159 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source