NYC DOB record · B01287897-P1

475 Kent Avenue

475 Kent Avenue, Brooklyn, NY 11249

Alteration filing in Williamsburg, Brooklyn. The latest DOB status is plan examiner review.

A DOB plan examiner is reviewing the application. Nothing has been approved yet. What every status means

Under reviewAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 10, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01287897-P1

475 Kent Avenue

Brooklyn, NY 11249

Alteration filing · status dated Sep 8, 2026

Current record
Under review
Proposed scale
11 stories
Dwelling units
104
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01287897-P1 as a alteration filing at 475 Kent Avenue, Brooklyn, NY 11249. Its latest published status category is Under review, dated Sep 8, 2026. The filing records 11 proposed stories and 104 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Under review
Latest status date
Sep 8, 2026
Proposed scale
11 proposed stories and 104 proposed dwelling units
Complete building dossierView all 9 filings associated with BIN 3059801Applicant of recordSee the 11 filings that name Paknia Engineering, PC
FiledSep 4, 2026
Current recordUnder review
Proposed scale11 stories
Recorded cost$250,000

What the filing says

A public-record reading of the proposed work.

[HUB ACCEPTED] Interior Renovation of existing apartments 306, 412, 603, 808 & 907. No change to Use, Egress, Occupancy, Floor Area or Bulk or Yards under this application. Work limited to interior modifications.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 11-story elevator apartment building built in 1911, with 98 homes, on a 24,524 sq ft lot.

Built
1911
Last altered
1983
Floors
11
Residential units
98
Building type
Elevator apartment building
Land use
Mixed residential and commercial
Zoning district
R6
Lot area
24,524 sq ft
Building area
147,104 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 10, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 3 open notices on record for this building, out of 255 notices on file; the most recent was issued Nov 30, 2004.

  • Elevator

    Issued Nov 30, 2004

  • Local law 10/81 -

    Issued Jan 13, 1997

  • Local law 10/81 -

    Issued Jan 13, 1997

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01287897-P1.

    01
  2. Current status updated

    The latest recorded filing status is “Plan Examiner Review.”

    02

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01287897-P1
BBL
3021590001
Review type
Standard Plan Examination
Existing stories
11
Proposed stories
11
Existing dwelling units
104
Proposed dwelling units
104
General construction