NYC DOB record · M01187222-I1

476 11 Avenue

476 11 Avenue, Manhattan, NY 10018

Alteration filing in Chelsea-Hudson Yards, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 26, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01187222-I1

476 11 Avenue

Manhattan, NY 10018

Alteration filing · status dated Sep 23, 2026

Current record
Approved
Proposed scale
52 stories
Dwelling units
590
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01187222-I1 as a alteration filing at 476 11 Avenue, Manhattan, NY 10018. Its latest published status category is Approved, dated Sep 23, 2026. The filing records 52 proposed stories and 590 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 23, 2026
Proposed scale
52 proposed stories and 590 proposed dwelling units
The building, not the filingwhat it sold for, the owner of record and every filing at BIN 1091000Applicant of recordSee the 91 filings that name Sotir Associates
FiledMar 11, 2025
Current recordApproved
Proposed scale52 stories
Recorded cost$300,391

What the filing says

A public-record reading of the proposed work.

Interior renovation to the existing 1st fl commercial space; new commercial cooking hood; new kitchen exhuast & compressors. associated plumbing work to be filed subsequently.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 52-story elevator apartment building built in 2020, with 590 homes, on a 15,140 sq ft lot.

Built
2020
Last altered
2018
Floors
52
Residential units
590
Building type
Elevator apartment building
Land use
Mixed residential and commercial
Zoning district
C6-4
Lot area
15,140 sq ft
Building area
445,590 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 2, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01187222-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01187222-I1
BBL
1007100001
Review type
Standard Plan Examination
Existing stories
52
Proposed stories
52
Existing dwelling units
590
Proposed dwelling units
590
General construction