NYC DOB record · M00823875-I1

49 Walker Street

49 Walker Street, Manhattan, NY 10013

Alteration filing in Tribeca-Civic Center, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 29, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M00823875-I1

49 Walker Street

Manhattan, NY 10013

Alteration filing · status dated Oct 26, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
8
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M00823875-I1 as a alteration filing at 49 Walker Street, Manhattan, NY 10013. Its latest published status category is Approved, dated Oct 26, 2026. The filing records 8 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 26, 2026
Proposed scale
8 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1075671Applicant of recordSee the 994 filings that name Fl&m Engineering Design &inspection
FiledFeb 8, 2023
Current recordApproved
Proposed scale8 units
Recorded cost$5,000

What the filing says

A public-record reading of the proposed work.

Installation of 300psf sidewalk shed and pipe scaffolding per plans. all equipment shall comply with chapter # 33 of the NYC code 2022, no changes in use egress or occupancy under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 5-story elevator apartment building built in 1869, with 7 homes, on a 2,535 sq ft lot.

Built
1869
Floors
5
Residential units
7
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
C6-2A
Lot area
2,535 sq ft
Building area
10,740 sq ft
Historic district
Tribeca East Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 18, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 17 open notices on record for this building, out of 25 notices on file; the most recent was issued Oct 23, 2026.

  • Construction

    Issued Oct 23, 2026 — FAILURE TO MAINTAIN. AT TIME OF INSPECTION OBSERVED ON EXPOSURE 1 NORTH ELEV EXTERIOR METAL CLASSING ADJACENT TO FIRE ESCAPE BETWEEN 1ST & GROUND FLOOR EXHIBITS CORROSION/SEPARATION/LOCALIZED HOLES. MASONRY IN SAME AREA CRACKS VERTICAL/HORIZONTAL; FIRE ESCAPE SPALLING PAINT & CORROSION. REMEDY: REPAIR AND/OR REPLACE

  • Construction

    Issued Jan 9, 2026 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLAINT MANNER. OBSERVED CORRODED METAL COLUMN ON EXPOSURE 1. REMEDY: REPAIR AND OR REPLACE

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • 14 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 18, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M00823875-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 97,160 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M00823875-I1
BBL
1001930033
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
8
Proposed dwelling units
8
Sidewalk shedScaffolding