What the filing says
A public-record reading of the proposed work.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 per square feet. sidewalk shed shall comply with chapter # 33 of the 2014 code. no change in use occupancy or egress under this application
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story walk-up apartment building built in 1899, with 3 homes, on a 2,000 sq ft lot.
- Built
- 1899
- Floors
- 3
- Residential units
- 3
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R6B
- Lot area
- 2,000 sq ft
- Building area
- 3,600 sq ft
- Historic district
- Willoughby-Hart Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 3 notices on file; the most recent was issued Jan 14, 2021.
- Construction
Issued Jan 14, 2021 — FAILURE TO MAINTAIN:FRONT WALL IS IN STATE OF DISREPAIR ORNAMENTAL STONE FELL ON FRONT YARD CRACKED AND SPALLING STONE NOTED AT WINDOWS AND THERE IS POTENTIAL OF DEBRIS FALLING.OWNR TO IMMD INSTL SW SHED AT FRNT TO PROVIDE OVERHEAD PROTECT TO FRNT ENTRANCE.ENGAGE PE & CONTR TO EVALU FACADE&RPR UNDR PRMT.FILE FOR PRMT BY 3/1/21.STRT WRK BY 4/1/21
- Construction
Issued Jan 11, 2021 — FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED AT EXPOSURE #1 DECORATIVE MASONRY OVER 1ST FL. ENTRANCE HAS COLLAPSED. CORNICE OVER 3RD FL. WINDOWS HAVE ROTTED EXPOSING INTERIOR TO ELEMENTS FURTHER DETERIORATING FACADES STRUCTURAL STABILITY.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00453613-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 61,761 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00453613-I1
- BBL
- 3017580064
- Postal code
- 11206 · 2951 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 3
- Proposed dwelling units
- 3








