What the filing says
A public-record reading of the proposed work.
Interior combination of apt 52b and 52c including partitions and finishes as per plans filed herewith. keeping 2nd kosher kitchen as per letter from jewish orthodox church. no change to use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 63-story condominium built in 2014, with 186 homes, on a 18,206 sq ft lot.
- Built
- 2014
- Floors
- 63
- Residential units
- 186
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- C6-9
- Lot area
- 18,206 sq ft
- Building area
- 386,869 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 15, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 16 open notices on record for this building, out of 100 notices on file; the most recent was issued Feb 22, 2023.
- No report and / or late filing (facade)
Issued Feb 22, 2023 — FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
- Elevator
Issued Mar 26, 2015
- Construction
Issued Mar 3, 1992
13 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 15, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01373390-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 61,761 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01373390-I1
- BIN
- 1090192
- BBL
- 1000177501
- Postal code
- 10006 · 52 filings
- Review type
- Standard Plan Examination
- Existing stories
- 64
- Proposed stories
- 64
- Existing dwelling units
- 182
- Proposed dwelling units
- 182








