What the filing says
A public-record reading of the proposed work.
Installation of temporary plywood fence as per plan. no change in use, egress, or occupancy. the plywood fence front of the building at riveriside drive on the south elevation.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 13-story hotel built in 1926, on a 27,900 sq ft lot.
- Built
- 1926
- Floors
- 13
- Residential units
- 0
- Building type
- Hotel
- Land use
- Public facilities and institutions
- Zoning district
- R8
- Lot area
- 27,900 sq ft
- Building area
- 258,120 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 1, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 101 notices on file; the most recent was issued Feb 16, 2023.
- Construction
Issued Feb 16, 2023 — REQUEST ADDITIONAL INFORMATION-RESPONDENT IS REQUESTED TO PROVIDE A S/S LETTER ALONG W/DETAILED CALCS,DWGS,FOUNDATION DETAILS,SOIL TYPES, ETC IN ACCORDANCE W/1RCNY 103-09 IDENTIFYING THE FACTUAL BASIS(INCL DATES PE PERSONALLY VISITED THE SITE)OF THE ENG'R ASSESSMENT REPORT REGARDING THE STRUCTUAL STABILITY OF THE R/W
- Elevator
Issued Jan 25, 2001 — 1P10023
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01234560-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded04
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01234560-I1
- BIN
- 1059870
- BBL
- 1019940057
- Postal code
- 10027 · 349 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 499
- Proposed dwelling units
- 499








