NYC DOB record · M01200295-I1

500 Riverside Drive

500 Riverside Drive, Manhattan, NY 10027

Alteration filing in Morningside Heights, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 22, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01200295-I1

500 Riverside Drive

Manhattan, NY 10027

Alteration filing · status dated Oct 20, 2026

Current record
Recorded as completed
Proposed scale
13 stories
Dwelling units
506
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01200295-I1 as a alteration filing at 500 Riverside Drive, Manhattan, NY 10027. Its latest published status category is Recorded as completed, dated Oct 20, 2026. The filing records 13 proposed stories and 506 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Oct 20, 2026
Proposed scale
13 proposed stories and 506 proposed dwelling units
The building, not the filingopen housing violations, what it sold for and every filing at BIN 1059870Applicant of recordSee the 104 filings that name Gensler
FiledSep 8, 2025
Current recordRecorded as completed
Proposed scale13 stories
Recorded cost$431,500

What the filing says

A public-record reading of the proposed work.

Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 1st floor and adjacent south patio ( I- House) as per plans. No change to use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 13-story hotel built in 1926, on a 27,900 sq ft lot.

Built
1926
Floors
13
Residential units
0
Building type
Hotel
Land use
Public facilities and institutions
Zoning district
R8
Lot area
27,900 sq ft
Building area
258,120 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 22, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 2 open notices on record for this building, out of 101 notices on file; the most recent was issued Feb 16, 2023.

  • Construction

    Issued Feb 16, 2023 — REQUEST ADDITIONAL INFORMATION-RESPONDENT IS REQUESTED TO PROVIDE A S/S LETTER ALONG W/DETAILED CALCS,DWGS,FOUNDATION DETAILS,SOIL TYPES, ETC IN ACCORDANCE W/1RCNY 103-09 IDENTIFYING THE FACTUAL BASIS(INCL DATES PE PERSONALLY VISITED THE SITE)OF THE ENG'R ASSESSMENT REPORT REGARDING THE STRUCTUAL STABILITY OF THE R/W

  • Elevator

    Issued Jan 25, 2001 — 1P10023

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 22, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01200295-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 84,915 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01200295-I1
BBL
1019940057
Review type
Professional Certification
Existing stories
13
Proposed stories
13
Existing dwelling units
506
Proposed dwelling units
506
General construction