NYC DOB record · B00637536-P1

502 Midwood Street

502 Midwood Street, Brooklyn, NY 11225

New building filing in Prospect Lefferts Gardens-Wingate, Brooklyn. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00637536-P1

502 Midwood Street

Brooklyn, NY 11225

New building · status dated Dec 28, 2022

Current record
Approved
Proposed scale
4 stories
Dwelling units
4
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00637536-P1 as a new building at 502 Midwood Street, Brooklyn, NY 11225. Its latest published status category is Approved, dated Dec 28, 2022. The filing records 4 proposed stories and 4 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
Dec 28, 2022
Proposed scale
4 proposed stories and 4 proposed dwelling units
The building, not the filingwhat it sold for and every filing at BIN 3106998Applicant of recordSee the 40 filings that name Best Engineering Technology Design
FiledSep 14, 2022
Current recordApproved
Proposed scale4 stories
Recorded cost$1

What the filing says

A public-record reading of the proposed work.

Proposed new four (4) story residential use building.

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story walk-up apartment building built in 2023, with 4 homes, on a 2,042 sq ft lot.

Built
2023
Floors
4
Residential units
4
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R6
Lot area
2,042 sq ft
Building area
4,840 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00637536-P1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00637536-P1
BBL
3048030025
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
4
Existing dwelling units
Empty in the source
Proposed dwelling units
4
General construction