NYC DOB record · B01429156-I1

51 Jay Street

51 Jay Street, Brooklyn, NY 11201

Alteration filing in Downtown Brooklyn-Dumbo-Boerum Hill, Brooklyn. The latest DOB status is plan examiner review.

A DOB plan examiner is reviewing the application. Nothing has been approved yet. What every status means

Under reviewAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 3, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01429156-I1

51 Jay Street

Brooklyn, NY 11201

Alteration filing · status dated Sep 30, 2026

Current record
Under review
Proposed scale
7 stories
Dwelling units
75
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01429156-I1 as a alteration filing at 51 Jay Street, Brooklyn, NY 11201. Its latest published status category is Under review, dated Sep 30, 2026. The filing records 7 proposed stories and 75 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Under review
Latest status date
Sep 30, 2026
Proposed scale
7 proposed stories and 75 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 3000036Applicant of recordSee the 6 filings that name Jose M. Landauro, P.E.
FiledSep 22, 2026
Current recordUnder review
Proposed scale7 stories
Recorded cost$375,000

What the filing says

A public-record reading of the proposed work.

Filing for facade repairs work that includes repair of brick masonry parapet walls, cut and point eroded mortar joints, replacement and/or repair of concrete window sills, application of waterproofing coatings, etc

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 7-story condominium built in 1905, with 76 homes, on a 27,250 sq ft lot.

Built
1905
Last altered
2014
Floors
7
Residential units
76
Building type
Condominium
Land use
Elevator apartments
Zoning district
M1-4/R8A
Lot area
27,250 sq ft
Building area
112,739 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 3, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 2 open notices on record for this building, out of 52 notices on file; the most recent was issued Aug 16, 1993.

  • Local law 62/91 - boilers

    Issued Aug 16, 1993

  • Local law 62/91 - boilers

    Issued Aug 16, 1993

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 2, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01429156-I1.

    01
  2. Current status updated

    The latest recorded filing status is “Plan Examiner Review.”

    02

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01429156-I1
BBL
3000317504
Review type
Standard Plan Examination
Existing stories
7
Proposed stories
7
Existing dwelling units
75
Proposed dwelling units
75
General construction