What the filing says
A public-record reading of the proposed work.
Facade repair work at corner of exposure 1 & 4 as per DOB control #370506. no change in use egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story walk-up apartment building built in 1920, with 3 homes, on a 4,000 sq ft lot.
- Built
- 1920
- Floors
- 2
- Residential units
- 3
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R5
- Lot area
- 4,000 sq ft
- Building area
- 4,384 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 29, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 5 open notices on record for this building, out of 5 notices on file; the most recent was issued Sep 15, 2026.
- Construction
Issued Sep 15, 2026 — FTC W/COMMISSIONER'S ORDER CONTROL#370508 VIO#061126PI30503HZ DATED 06/11/26 REQUIRING OWNER TO PERFORM EMERGENCY WORK AS REQ'D AS OF 09/15/26 THE EMERGENCY WORK WAS NOT PERFORMED AND NO COMPLIANCE IMMED COMPLY W/COMMISSIONER'S ORDER CONTROL#370508 VIO#061126PI30503HZ
- Immediate
Issued Jun 12, 2026 — INSTALL APPROXIMATELY 22 LINEAR FT OF SIDEWALK SHED ALONG THE ENTIRELY OF THE BUILDING'S EXPOSURE #1 (FACING JEROME STREET) AND WRAPPING AROUND ONTO EXPOSURE #4 FOR APPROXIMATELY ANOTHER 10 LI9NEAR FT. TOTAL SIDEWALK SHED IS APPROXIMATELY 32 LINER FT
- Construction
Issued Jun 11, 2026 — FTM BLDG IN CODE COMPLIANT MANNER-OBSVD CRACKED MORTAR AT VARIOUS LOCATIONS W/FRONT BLDG CORNER TO THE RIGHT SIDE EXP1&4 CORNER,FORMING A DISPLACMENT AND/OR DISLODGED BRICKS ABOVE 1FL LEVEL. OWNER IMMED RETAIN NYSPE TO EVAL THE ENTIRE BLDG,PREPARE/FILE REPAIR DWGS,REPAIR BLDG UNDER PERMIT, START WORK BY 08/11/26
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 26, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01437977-I1.
- Current status updated02
The latest recorded filing status is “Objections.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 75,295 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01437977-I1
- BIN
- 3090061
- BBL
- 3040620018
- Postal code
- 11207 · 3217 filings
- Review type
- Standard Plan Examination
- Existing stories
- 2
- Proposed stories
- 2
- Existing dwelling units
- 3
- Proposed dwelling units
- 3








