NYC DOB record · B01437977-I1

515 Jerome Street

515 Jerome Street, Brooklyn, NY 11207

Alteration filing in East New York (North), Brooklyn. The latest DOB status is objections.

The examiner raised objections. The applicant has to resolve them before the filing can be approved. What every status means

Under reviewAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 29, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01437977-I1

515 Jerome Street

Brooklyn, NY 11207

Alteration filing · status dated Sep 24, 2026

Current record
Under review
Proposed scale
2 stories
Dwelling units
3
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01437977-I1 as a alteration filing at 515 Jerome Street, Brooklyn, NY 11207. Its latest published status category is Under review, dated Sep 24, 2026. The filing records 2 proposed stories and 3 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Under review
Latest status date
Sep 24, 2026
Proposed scale
2 proposed stories and 3 proposed dwelling units
Applicant of recordSee the 13 filings that name Mohammad Ahead - PE, PLLC
FiledSep 17, 2026
Current recordUnder review
Proposed scale2 stories
Recorded cost$10,000

What the filing says

A public-record reading of the proposed work.

Facade repair work at corner of exposure 1 & 4 as per DOB control #370506. no change in use egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story walk-up apartment building built in 1920, with 3 homes, on a 4,000 sq ft lot.

Built
1920
Floors
2
Residential units
3
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R5
Lot area
4,000 sq ft
Building area
4,384 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 29, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 5 open notices on record for this building, out of 5 notices on file; the most recent was issued Sep 15, 2026.

  • Construction

    Issued Sep 15, 2026 — FTC W/COMMISSIONER'S ORDER CONTROL#370508 VIO#061126PI30503HZ DATED 06/11/26 REQUIRING OWNER TO PERFORM EMERGENCY WORK AS REQ'D AS OF 09/15/26 THE EMERGENCY WORK WAS NOT PERFORMED AND NO COMPLIANCE IMMED COMPLY W/COMMISSIONER'S ORDER CONTROL#370508 VIO#061126PI30503HZ

  • Immediate

    Issued Jun 12, 2026 — INSTALL APPROXIMATELY 22 LINEAR FT OF SIDEWALK SHED ALONG THE ENTIRELY OF THE BUILDING'S EXPOSURE #1 (FACING JEROME STREET) AND WRAPPING AROUND ONTO EXPOSURE #4 FOR APPROXIMATELY ANOTHER 10 LI9NEAR FT. TOTAL SIDEWALK SHED IS APPROXIMATELY 32 LINER FT

  • Construction

    Issued Jun 11, 2026 — FTM BLDG IN CODE COMPLIANT MANNER-OBSVD CRACKED MORTAR AT VARIOUS LOCATIONS W/FRONT BLDG CORNER TO THE RIGHT SIDE EXP1&4 CORNER,FORMING A DISPLACMENT AND/OR DISLODGED BRICKS ABOVE 1FL LEVEL. OWNER IMMED RETAIN NYSPE TO EVAL THE ENTIRE BLDG,PREPARE/FILE REPAIR DWGS,REPAIR BLDG UNDER PERMIT, START WORK BY 08/11/26

  • 2 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 26, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01437977-I1.

    01
  2. Current status updated

    The latest recorded filing status is “Objections.”

    02

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 75,295 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01437977-I1
BIN
3090061
BBL
3040620018
Review type
Standard Plan Examination
Existing stories
2
Proposed stories
2
Existing dwelling units
3
Proposed dwelling units
3
General construction