NYC DOB record · B00895717-I1

708 Jerome Street

708 Jerome Street, Brooklyn, NY 11207

Alteration filing in East New York-New Lots, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 23, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00895717-I1

708 Jerome Street

Brooklyn, NY 11207

Alteration filing · status dated Sep 21, 2026

Current record
Recorded as completed
Proposed scale
3 stories
Dwelling units
3
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00895717-I1 as a alteration filing at 708 Jerome Street, Brooklyn, NY 11207. Its latest published status category is Recorded as completed, dated Sep 21, 2026. The filing records 3 proposed stories and 3 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Sep 21, 2026
Proposed scale
3 proposed stories and 3 proposed dwelling units
Applicant of recordSee the 64 filings that name Aa Bldg & Insp Svc LLC
FiledJul 31, 2023
Current recordRecorded as completed
Proposed scale3 stories
Recorded cost$196,200

What the filing says

A public-record reading of the proposed work.

Herewith file alteration in order to do an interioir renovation in an existing three family dwelling. to erect partitions, to relocate plumbing fixtures (plumbing filed subsequently) and to obtain a letter of completeion. no change to use occup. or egress

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story walk-up apartment building built in 1925, with 3 homes, on a 2,000 sq ft lot.

Built
1925
Floors
2
Residential units
3
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R5
Lot area
2,000 sq ft
Building area
3,252 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 23, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 5 open notices on record for this building, out of 5 notices on file; the most recent was issued Dec 11, 2019.

  • Fail to certify class

    Issued Dec 11, 2019 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

  • Fail to certify class

    Issued Dec 11, 2019 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

  • Fail to certify class

    Issued Dec 11, 2019 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

  • 2 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 23, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00895717-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 67,630 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00895717-I1
BIN
3097524
BBL
3043320011
Review type
Standard Plan Examination
Existing stories
3
Proposed stories
3
Existing dwelling units
3
Proposed dwelling units
3
General construction