What the filing says
A public-record reading of the proposed work.
Temporary Installations to be used on a temporary event " No Obstacles-A Race for the Warriors". All the Installations are to be removed upon completion of the event.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3.5-story government property built in 1900, on a 7,577,714 sq ft lot.
- Built
- 1900
- Floors
- 3.5
- Residential units
- 0
- Building type
- Government property
- Land use
- Public facilities and institutions
- Zoning district
- R3-2
- Lot area
- 7,577,714 sq ft
- Building area
- 2,532,066 sq ft
- Historic district
- Governors Island Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 2, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 1 notice on file; the most recent was issued Nov 4, 2019.
- Construction
Issued Nov 4, 2019 — FTM/EMERG WRK:GOVN'S IS,IS A NYC OWNED PROPERTY MASON W/WOOD AND WOOD FRAMED BLDGS.NUMEROUS OF THE BLDGS ALL VACANT ARE IN POOR TO FAILED STRCTL CONDITION,ONE OF WHICH ALREADY COLLAPSED IN AN UNCONTROLLED MANNER.IMMED FENCE THE BLDG PER NYC BLDG CODE.IMMED DEMO THE BLDGS ABOVE NOTED(10 TOTAL)FILE&PERMIT ALL WORK.COMPLY WITH BLDG CODE
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 2, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01463050-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01463050-I1
- BIN
- 1086421
- BBL
- 1000010010
- Postal code
- 10004 · 108 filings
- Review type
- Professional Certification
- Existing stories
- 1
- Proposed stories
- 1
- Existing dwelling units
- 0
- Proposed dwelling units
- 0