NYC DOB record · B01477560-I1

518 3 Avenue

518 3 Avenue, Brooklyn, NY 11215

Alteration filing in Carroll Gardens-Cobble Hill-Gowanus-Red Hook, Brooklyn. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 1, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01477560-I1

518 3 Avenue

Brooklyn, NY 11215

Alteration filing · status dated Oct 30, 2026

Current record
Approved
Proposed scale
3 stories
Dwelling units
2
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01477560-I1 as a alteration filing at 518 3 Avenue, Brooklyn, NY 11215. Its latest published status category is Approved, dated Oct 30, 2026. The filing records 3 proposed stories and 2 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 30, 2026
Proposed scale
3 proposed stories and 2 proposed dwelling units
Applicant of recordSee the 12 filings that name Constscape
FiledOct 22, 2026
Current recordApproved
Proposed scale3 stories
Recorded cost$28,000

What the filing says

A public-record reading of the proposed work.

Repair existing exterior facade facing third avenue and 12th street, including removal of loose and deteriorated stucco, preparation of sound substrate, and replacement of missing and cracked stucco at parapet and wall areas

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 3-story mainly residential with some commercial built in 1931, on a 1,500 sq ft lot.

Built
1931
Floors
3
Residential units
2
Building type
Mainly residential with some commercial
Land use
Mixed residential and commercial
Zoning district
C4-4A
Lot area
1,500 sq ft
Building area
3,300 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 1, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 14 open notices on record for this building, out of 15 notices on file; the most recent was issued Oct 8, 2026.

  • Construction

    Issued Oct 8, 2026 — CORRECTIVE ACTION PLAN REQ'D-OBSVD HAZ CONDITIONS W/THE EXTERIOR FACADE CRACKED-MISSING STUCCO ALONG THE PARAPET WALL CORNER EDGES W/ CRACKS & ANOTHER MISSING BRICKS, MORE CRACKS TO OTHER EAREAS OF THE BLDG. OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANDING W/DOB&NYS TO EVAL ENTIRE BLDG & SUBMIT A CORRECTIVE ACTION PLAN BY 10/22/2026

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION

  • 11 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 1, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01477560-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 91,066 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01477560-I1
BIN
3337653
BBL
3010200044
Review type
Standard Plan Examination
Existing stories
3
Proposed stories
3
Existing dwelling units
2
Proposed dwelling units
2
General construction