What the filing says
A public-record reading of the proposed work.
File for Proposed Repair or Structural Stability Intervention for the Building Damaged by Fire & removed violations $ 35118639M , 35685756M, plumbing work on separate application. No change in egress, no change to other parts of the building
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story two-family home built in 1920, on a 2,003 sq ft lot.
- Built
- 1920
- Floors
- 2
- Residential units
- 2
- Building type
- Two-family home
- Land use
- One and two family homes
- Zoning district
- R6B
- Lot area
- 2,003 sq ft
- Building area
- 2,248 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 8, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 4 notices on file; the most recent was issued Oct 6, 2025.
- Immediate
Issued Oct 6, 2025 — SEAL UP ALL OPENINGS TO MAKE BUILDING SAFE
- Immediate
Issued Oct 6, 2025 — BSERVED WINDOWS AND DOORS OUT, WALLS AND CEILING DAMAGED, ROOF OPEN TO THE ELEMENTS, FIRE SEPARATION BETWEEN TWO BUILDINGS COMPROMISED, DUE TO FIRE AND BUILDING REMAINS UNGUARDED AT THIS TIME. THESE HAZARDOUS CONDITIONS POSE AN IMMEDIATE DANGER TO THE PUBLIC
- Construction
Issued Oct 4, 2025 — STRUCTURE RENDERED NONCOMPLIANT, OBSERVED WINDOWS AND DOORS OUT, CEILI NG AND WALLS DAMAGED, ROOF OPEN TO THE ELEMENTS, SEPARATION BTWN BUILD INGS COMPROMISED DUE TO FIRE
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 8, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01389520-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Plan Examiner Review.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 77,401 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01389520-I1
- BIN
- 3011007
- BBL
- 3007320023
- Postal code
- 11232 · 1604 filings
- Review type
- Standard Plan Examination
- Existing stories
- 2
- Proposed stories
- 2
- Existing dwelling units
- 2
- Proposed dwelling units
- 2