What the filing says
A public-record reading of the proposed work.
To resolve ecb #35685761r & 35685760p by remove illegalpartitions and to replace all work filed under 320064023 fortwo family house with general construction as per plan filedherewith. no change in use, egress and occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story two-family home built in 1920, on a 2,003 sq ft lot.
- Built
- 1920
- Floors
- 2
- Residential units
- 2
- Building type
- Two-family home
- Land use
- One and two family homes
- Zoning district
- R6B
- Lot area
- 2,003 sq ft
- Building area
- 2,248 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 22, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 2 notices on file; the most recent was issued Oct 6, 2025.
- Immediate
Issued Oct 6, 2025 — SEAL UP ALL OPENINGS TO MAKE BUILDING SAFE
- Construction
Issued Oct 4, 2025 — STRUCTURE RENDERED NONCOMPLIANT, OBSERVED WINDOWS AND DOORS OUT, CEILI NG AND WALL DAMAGED, ROOF OPEN TO THE ELEMENTS DUE TO FIRE AT 740 43 S TREET VACATE ENTIRE BUILDING
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 22, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01326849-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “On Hold - Pending Supersede of Applicant of Record.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 84,915 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01326849-I1
- BBL
- 3007320021
- Postal code
- 11232 · 1660 filings
- Review type
- Standard Plan Examination
- Existing stories
- 2
- Proposed stories
- 2
- Existing dwelling units
- 2
- Proposed dwelling units
- 2