NYC DOB record · M01255532-I1

519 West 23 Street

519 West 23 Street, Manhattan, NY 10011

Alteration filing in Chelsea-Hudson Yards, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 16, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01255532-I1

519 West 23 Street

Manhattan, NY 10011

Alteration filing · status dated Oct 14, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
11
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01255532-I1 as a alteration filing at 519 West 23 Street, Manhattan, NY 10011. Its latest published status category is Approved, dated Oct 14, 2026. The filing records 11 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 14, 2026
Proposed scale
11 proposed dwelling units
Applicant of recordSee the 183 filings that name Mje Professional Services
FiledJul 14, 2025
Current recordApproved
Proposed scale11 units
Recorded cost$5,000

What the filing says

A public-record reading of the proposed work.

Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the NYC building code. no change in use, occupancy, or egress under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 12-story condominium built in 2005, with 11 homes, on a 2,469 sq ft lot.

Built
2005
Floors
12
Residential units
11
Building type
Condominium
Land use
Elevator apartments
Zoning district
C6-3A
Lot area
2,469 sq ft
Building area
18,732 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 16, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01255532-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 81,398 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01255532-I1
BIN
1087672
BBL
1006957505
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
11
Proposed dwelling units
11
Sidewalk shed