NYC DOB record · B00479923-P1

52 Clark Street

52 Clark Street, Brooklyn, NY 11201

Alteration filing in Brooklyn Heights, Brooklyn. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00479923-P1

52 Clark Street

Brooklyn, NY 11201

Alteration filing · status dated Nov 23, 2021

Current record
Approved
Proposed scale
9 stories
Dwelling units
136
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00479923-P1 as a alteration filing at 52 Clark Street, Brooklyn, NY 11201. Its latest published status category is Approved, dated Nov 23, 2021. The filing records 9 proposed stories and 136 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Nov 23, 2021
Proposed scale
9 proposed stories and 136 proposed dwelling units
Complete building dossierView all 4 filings associated with BIN 3001859Applicant of recordSee the 30 filings that name Project Tactical Solutions, LLC
FiledNov 23, 2021
Current recordApproved
Proposed scale9 stories
Recorded cost$20,000

What the filing says

A public-record reading of the proposed work.

Filing herewith for combination of apartments 2m & 2n consisting of general construction. no change in use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 9-story elevator apartment building built in 1927, with 141 homes, on a 14,200 sq ft lot.

Built
1927
Last altered
1990
Floors
9
Residential units
141
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R7-1
Lot area
14,200 sq ft
Building area
79,460 sq ft
Historic district
Brooklyn Heights Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 8 open notices on record for this building, out of 56 notices on file; the most recent was issued Jun 23, 2024.

  • Failure to submit

    Issued Jun 23, 2024 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023)

  • Failure to submit

    Issued Apr 22, 2023 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2022)

  • Plumbing

    Issued Jul 20, 2022 — I OBSERVED IN CELLAR LAUNDRY ROOM NEWLY INSTALLED COMMERCIAL GAS DRYERS, PIPING AND NO PERMITS ON FILE AND PRESENTS AN IMMINENT RISK TO PUBLIC SAFETY. YOU ARE HEREBY ORDERED TO IMMEDIATELY CORRECT THE ABOVE CONDITION BY RETAINING A LIC. PROFESSIONAL TO PERFORM ALL WORK NECESSARY TO RESTORE THE NON-COMPLIANT CONDITION(S) TO A CODE

  • 5 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00479923-P1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00479923-P1
BBL
3002360103
Review type
Professional Certification
Existing stories
9
Proposed stories
9
Existing dwelling units
136
Proposed dwelling units
136
General construction