What the filing says
A public-record reading of the proposed work.
Application filed for temporary construction fence to address violation 35647619Z and for NB # M00775662-I1
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story place of worship built in 1959, on a 45,971 sq ft lot.
- Built
- 1959
- Last altered
- 1963
- Floors
- 6
- Residential units
- 0
- Building type
- Place of worship
- Land use
- Public facilities and institutions
- Zoning district
- R7-2
- Lot area
- 45,971 sq ft
- Building area
- 24,839 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 14 open notices on record for this building, out of 32 notices on file; the most recent was issued Apr 2, 2026.
- Construction
Issued Apr 2, 2026 — FAILURE TO MAINTAIN BUILDING EXTERIOR WALLS AND APPURTANCE IN CODE COMPLIANT MANNER. OBSERVED MISSING WINDOW W/ PLYWOOD BLOCKING, DEFECTED MORTAR JOINTS, DETERIORATED MASONRY WALLS AT EXPOSURE 1, 2 WEST AND NORTH ELEVATION. REMEDY: OWNER TO REPAIR AND/OR REPLACE
- Low pressure boiler
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
- Construction
Issued Sep 26, 2025 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED CRACKED/SPALLED STONE WORK AND DAMAGED MORTAR JOINTS ON EXPOSURE 1 REMEDY: REPAIR AND/OR REPLACE
11 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M08022728-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M08022728-I1
- BIN
- 1076762
- BBL
- 1021800027
- Postal code
- 10033 · 66 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 164
- Proposed dwelling units
- 164